R.Hotzenplotz
2018-01-06 14:52:37
- #1
But I don’t know which stage you are at, nor what else you have going on.
The construction is about to start. The earthworks will probably begin in 1-2 weeks. Unfortunately, the heating load calculation came at the last minute and ruined the actual plan. Otherwise, I have quite a lot on my plate. I like to do research, but I will not carry out anything myself. The idea of using the excavator guys is out of the question. I hire professional companies for everything.
Regarding the offered "air heat pump," the manufacturer actually states air-water heat pump. I am still a bit confused whether it is a pure air heat pump or an air-water heat pump. The price difference compared to solar and gas also seems quite small to me. In sample calculations, there is always a difference of many thousands of euros in favor of gas and solar; for me, it is only about €2,100 - €2,600.
The region is NRW.
I will have it calculated. It is actually a joke that I am supposed to decide without it having been calculated. Sure, the execution planning is urgent, and it is relevant for that (exhaust shaft). Although it is not my fault that the heating load calculation only just arrived, I’m still the fool if the construction is delayed because of it.
What you write about the heating engineers, I see it the same way. I am now convinced in many areas that consulting and purchasing should be strictly separated.