You can see that almost everywhere the word “extra charge” is included. Do you think it’s there because it’s optional or because it won’t affect you? What do you think will happen if you want to add an extra socket or a burner? €60 per individual socket is not uncommon.

I didn’t build with a general contractor myself, but I’ve heard quite a bit from some neighbors because they didn’t know better and simply didn’t inform themselves adequately or trusted the general contractor and thus spent a fortune weekly on toilet, power box, and scaffolding.

My shell builder included the power box and toilet, even until the end of the construction work when he had long since left himself. The scaffolding was also left standing beyond the shell construction so that the remaining trades could use it (flat rate). It’s all negotiable.

You can calculate for yourself what 3x €100 per week for 5 months will cost you if it’s not included.
 

thoughtless86

2021-05-17 19:51:43
  • #2
As a tip, I can add here that everything that is already determined as part of the preliminary layout beforehand, such as electrical planning (additional sockets, ceiling spots, and so on), should be included in the contract before signing at an agreed price, provided the general contractor agrees. Everything that is agreed upon later under the work contract costs almost twice as much. That can quickly become 80€ for a single socket or 100€ for a ceiling spot...
 

cyberosti

2021-05-17 19:55:52
  • #3
I understand, but I don’t see a difference compared to other construction service descriptions I have read. These items were almost identical. And I also rely on the experiences of other builders from this provider who have not reported excessive costs. Really no one! I realize that it’s then not all premium quality, and I can accept that.
 

cyberosti

2021-05-17 19:56:54
  • #4
Good idea. Thanks for the tip!
 

T_im_Norden

2021-05-17 20:05:32
  • #5
Well, that partly depends on the property, for example, anything over 20 centimeters of topsoil you have to pay for. That means removing the topsoil and replacing it with the appropriate subsoil. Your planned 5000 for earthworks can quickly turn into 20,000. If you have already bought the property, you probably already have the soil report [Bodengutachten], you can take a look at it.
 

Yaso2.0

2021-05-17 20:06:26
  • #6


Our general contractor referred us directly to the executing company for everything that was not described in the construction service description.

I had the electrician quote the costs in advance for items such as additional sockets, LAN cables, ceiling outlets, spots, etc.

This way, we were able to determine during our planning that we would need to spend about 10k extra for the electrician.

With plumbing, this is not possible; it depends on what you choose.

All other additional costs like higher ceilings, electric shutters, etc., were always communicated to us directly by the general contractor whenever we considered the "extra."
 

Similar topics
02.07.2014Realistic purchase of land and new construction of a single-family house & how to finance it?20
19.01.2016New construction - Plot overgrown with blackberries12
06.12.2019Neighbors' bushes on our property...37
05.04.2015Property reserved. Financing is pending52
19.11.2015New construction on a new plot without a child - how do we approach it?38
29.08.2019Loan amount in Berlin with existing land14
01.12.2017The bank may want a construction service description despite individual subcontract awarding26
29.10.2018Earthworks in the construction performance description17
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
22.12.2019Crane from the neighbor on my property67
22.11.2023Location of city villa or single-family house on 500 m2 plot - rectangular585
23.03.2020Building law: Electrician refuses to continue78
17.04.2020Construction Performance Description Formulation13
12.12.2020Commitment to the property and what comes next53
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
03.06.2021Property purchased - start construction planning before handover?11
11.03.2023Plot Single-family house C630 Heinz von Heiden at the location Saxony64
10.08.2022Foundation cushioning Town & Country house construction service description10
09.07.2023Electrician Cost Estimate - New Installation22
21.01.2025Prefabricated house and land calculated - under €600,000?25

Oben