Zaba12
2021-05-17 19:45:55
- #1
You can see that almost everywhere the word “extra charge” is included. Do you think it’s there because it’s optional or because it won’t affect you? What do you think will happen if you want to add an extra socket or a burner? €60 per individual socket is not uncommon.
Can you be more specific about what is missing in almost every position? I understand that I won’t manage with the electrical part. Do other companies include construction power and a toilet? Everything I have received so far, even from other more expensive companies, was always without these items.
I didn’t build with a general contractor myself, but I’ve heard quite a bit from some neighbors because they didn’t know better and simply didn’t inform themselves adequately or trusted the general contractor and thus spent a fortune weekly on toilet, power box, and scaffolding.
My shell builder included the power box and toilet, even until the end of the construction work when he had long since left himself. The scaffolding was also left standing beyond the shell construction so that the remaining trades could use it (flat rate). It’s all negotiable.
You can calculate for yourself what 3x €100 per week for 5 months will cost you if it’s not included.