Can someone say how much cheaper a building notification including all required application documents ([Bebauungsplan liegt vor]) is compared to a building application? Preferably for NRW... Thanks!
Can anyone say how much cheaper a building notification including all required application documents (development plan is available) is compared to a building application? Preferably for NRW... Thanks!
Are you asking about the fees at the building regulation office? Or the preparation by an architect? You should be able to check the fees for your federal state/municipality on their website, they usually depend on the estimated construction costs. The preparation by the architect is based on the HOAI, there is an online calculator for that.
I once asked my Excel. Now everything is finished, moved in, etc. What is not yet finished is the garage access and the official surveying. I think about 6,000-8,000 euros will be added. And we were really "thrifty," typically Swabian. Nothing exaggerated/luxury, for example, the garden was only leveled, a retaining wall to the garden, a light well with planter, and paving of the garage driveway. The house was inclusive of all trades (painter, flooring, etc.) [ATTACH alt="liste-der-anfallenden-baunebenkosten-bauseits-teurer-226596-1.png"]16913[/ATTACH]
Those were still prices! Wow. 50K for a plot. I can’t even get 5 sqm with that here lol