Prefab house made of Neopor - experiences?

  • Erstellt am 2016-01-26 17:49:06

degriech

2019-11-14 15:52:11
  • #1
Hello

I am revisiting this topic even though a few months have passed. (What is the current status?)

I am also considering building with Isorast because, in my opinion, there are more advantages than disadvantages. (Provided good preliminary planning)
with which system did you build and would it be possible to take a look at it sometime, as I am also from Ludwigshafen, that would be really great also for exchange, etc.
Thanks in advance

Best regards
 

PassivLu

2019-11-14 22:52:41
  • #2
Hi Greek... I have built with euromac2. You can still see something of the system at my construction site. If you have any questions... just get in touch.
 

degriech

2019-11-15 09:48:49
  • #3
Hey thanks for the quick response. Then I'll start with the questions =)

1. Do you do everything alone or do you have a contact person who supports you, instructs you, etc.
2. Do you use everything from euromac2, meaning also floor slabs, ceilings, and roof systems, or just the bricks
3. Have you already noticed significant disadvantages in pipe construction, or what definitely has to be considered if, like me, you are still at the beginning.

(I can't privately message you yet because I haven't written 100 messages..)
 

PassivLu

2019-11-16 00:11:02
  • #4
Hello 1. With this system, you receive training. There are even seminars where you can "tinker around" at the factory (back then only in French) and information days where the system and all possible questions are clarified. Someone always comes to help with the concreting, which is absolutely sensible. 2. I don’t use everything from Euromac2. I used the stones and the roof elements. The roof elements are top quality and really quick to install. 3. Honestly, I can’t say anything negative about the system, the company, or the representative based in Altrip. Contact with Euromac was always very friendly and helpful. Appointments worked out and everything was adhered to. And even with further construction questions, tips were given or contacts were established/mediated. I also can’t create private messages yet. Cheers
 

degriech

2019-11-16 09:35:17
  • #5
That already sounds great.

Did you have your own architect plan it or did you get one recommended by the consultant?
If it's no trouble, can you just give me the contact details of the consultant or is that the number listed at euromac as the info number?
 

PassivLu

2019-11-16 23:43:07
  • #6
Hello
So I built with an architect who was also recommended to me by Mr. Scheunemann.
At first, we tried to plan something ourselves, which was not so easy. The architect was definitely worth it.
It is helpful if the architect is familiar with the system.
Try calling this number.
Attached are two pictures from the construction back then

 

Similar topics
19.07.2018Draw the plan yourself? Do you necessarily need an architect?11
18.02.2011Architect totally messed up - experiences?17
30.09.2012Final invoice architect13
27.10.2013Architect --> Agreements? What is that?21
16.04.2014Cost of soil survey - Does the architect pay or do we?12
16.09.2014Termination of collaboration with architect - demands excessive fee28
01.10.2014Collaboration with an architect - how does it work properly?22
25.02.2015Planning / Architect, involvement of specialist planners for the approval plan10
10.04.2015Cost estimate architect single-family house. Your assessment44
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
27.12.2015Who has built with an architect? Experiences??85
11.09.2015Building a garage on the boundary is not possible according to the architect.11
17.11.2015Is an architect really that expensive?46
05.04.2020Developer or architect - costs43
07.03.2016Various dimensions architect execution drawing12
23.09.2016Architect and budget limit... insurance? possibilities25
17.04.2017Civil Engineer vs. Architect17
13.06.2017Architect or developer? Which is more affordable?13
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
21.02.2019Alternative facade in clinker look27

Oben