How big do you want to build?
 

xycrazy

2015-08-15 18:35:15
  • #2
300m², of which approx. 240 living space
 

Baufie

2015-08-15 18:51:50
  • #3
Just as a rough guide. We have a cost estimate from an architect of 580,000 EURO. The project looks as follows: 1.5-story, approx. 181 sqm living space, fully basement plus solid double garage with approx. 42 sqm. Everything included, so also planning costs, outdoor facilities, etc... Accordingly, your offer does not surprise me. Where do you want to build in BaWü?
 

Weimy

2015-08-15 21:00:51
  • #4
Hello, we are also building with an architect, nothing else was an option for us... our new house will have 230 sqm of living space, the garage 36 sqm. Planned is 400,000 € without a basement but with high-end fittings including outdoor facilities.
 

merlin83

2015-08-16 08:51:24
  • #5
In our experience, the construction companies usually did not fully inform us about the cost framework and did not provide information about expected additional costs and incidental expenses. From a completed construction project, I can tell you that for a 144 sqm builder's house price, about EUR 80,000 were added for extra charges, exterior facilities, connection fees, and permits.

For your project, I would also plan at least EUR 450,000 for the house plus the aforementioned EUR 80,000.
 

Username_wahl

2015-08-16 11:31:16
  • #6
Our house in timber frame construction Kfw55 172 sqm without a basement should cost around 350k with everything included (without land and incidental costs) according to the architect. I hope that works out, because we have applied for the loan based on that...
 

Similar topics
18.08.2013Massive house with basement. Is our budget enough?11
12.03.2013What is the maximum rate for a net salary of 3,000 euros?24
19.04.2013Budget for the construction of a single-family house with a WU concrete basement27
19.03.2014Cost for a new single-family house, 2 full floors, without basement18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
09.04.2015Sacrifice the basement for 20m² more living space?15
17.01.2017Additional costs of a finished house23
13.04.2020Basement or garage, or basement with integrated garage14
28.06.2017House with basement or without?49
17.10.2017Construction costs for a single-family house 190m² + basement including a granny flat28
10.11.2017House plan by architect 2 floors with basement18
22.12.2017Construction costs for a single-family house with a basement in NRW84
24.02.2018Construction costs of a single-family house with a basement and double garage29
01.07.2020Calculation for a single-family house with 175m² living area, basement, and double garage79
09.06.2021House construction planning: solid house or prefabricated house? With or without a basement?80
30.08.2021Bungalow with basement for single-family house with 60m2 office, is it reasonable?23
21.04.2024Cost estimation per square meter of living area for a hillside house with basement and garage87
11.03.2024Is the architect's cost estimate realistic?10
14.09.2024New construction cost calculation, suitable for architect?30
08.06.2025L-Bank Z-20 limited residential area with basement39

Oben