small update:
Move-in is planned for January, anticipation is high, a big part of the marathon is done.
Done: ceilings and walls almost all finished, floor prepared for laying, heating installed, electricity and water connected, basement tiled, basement stairs finished
still to do: finish electrical distribution box outlets etc., finish tiles/bathroom sanitary, lay floor, kitchen arrives on 01/06, install doors, stair covering on upper stairs