Dachshund90
2023-04-28 10:20:48
- #1
Good morning,
attached is the current status again. The following points are still on the agenda for further clarification before moving on to the further details:
- chimney through ridge
- door size bathroom
- exact wall arrangement upper floor
- slope design southeast
- roof overhang (here we would like to hear opinions again, visually it almost appears somewhat too generous)
best regards
attached is the current status again. The following points are still on the agenda for further clarification before moving on to the further details:
- chimney through ridge
- door size bathroom
- exact wall arrangement upper floor
- slope design southeast
- roof overhang (here we would like to hear opinions again, visually it almost appears somewhat too generous)
best regards