Hello .

I would also recommend that you take a look at 1-2 model home parks. It doesn’t matter whether they are finished or solid construction. Just look at some houses to determine which style and size suit you.
After that – as a previous speaker already mentioned – select a range of possible builders. We limited ourselves to 5 at the time, and after the first consultation round, you can already cross off at least 2 just based on gut feeling.

In the end, we had 2 very comparable offers (including costs for additional requests, etc.) with fairly similar floor plans. That made it very easy to compare (scope of work!!!). Ultimately, both companies would have certainly been good, and in the end, it was a gut feeling that made the decision.

Just get some advice and roughly think about how much you want/can spend beforehand. The price can be adjusted upwards very quickly and easily, and downwards you can still reach your own maximum amount with a few compromises.

Have fun scheduling all the meetings for the talks.
 

ypg

2016-08-11 14:20:30
  • #2
No, no property developer!!! A property developer sells house AND land together. Find a reputable BU or a GU/GÜ
 

Evolith

2016-08-11 14:23:16
  • #3
I would always be cautious with the term budget provider. These providers build you a house to the technical minimum standard. Whether that is enough for you, you have to decide.

Whether your construction proceeds or not depends entirely on your preparation and the competence of the construction manager. If that is lousy, you hardly have a chance – regardless of the provider.

I can only report from our experience. We are building our bungalow (also without a basement) with Heinz von Heiden as well. I hope the start will be in a few weeks. In our region, it feels like every fourth person builds with this company.

If you want our cost calculation, feel free to send a PM. We are pretty detailed there.

But what I can already tell you now: with €170,000 you will never make it for the house. For that money, you get the standard bathroom (there really are nicer ones), the cheapest roof shingles, cheap stairs, etc.
You will upgrade most things, and it adds up. We paid an extra €3,000 for the bathroom and only took minor upgrades.
Also not to be underestimated are the additional costs for tiles (you only have €25/sqm) and the electrical package, where fundamentally too few outlets are calculated.

Regarding the soil report: Most companies require a report. If you already had one done before, you can offset that cost.

So definitely have one done before buying the plot. We also did it and found out that we comfortably need to go 1 meter down so that the foundation slab lies properly. On top of that, there are fill requirements. In total, we need to go 2 meters up again and cannot yet say how much soil we can bring back. The cost is a maximum of €34,000.

Plan at least €20,000 as a buffer. Rather more. That money disappears very quickly.
We are expected to pay €420,000 for our construction project. Monthly installment €1,420 and we will be done in 26 years.
 

Peanuts74

2016-08-11 14:27:18
  • #4


How much of the €420,000 does the land make up, and how big is the house?
 

Evolith

2016-08-11 14:31:09
  • #5

The land with 964 sqm cost us €122,000.

The bungalow will be a 14x14.5m bungalow.

Surprisingly high costs:
We had to change the roof due to building regulations + €7,000
Additional costs for the fill (planned 20k) + €14,000 --> Worst case
Lifting system for wastewater + €4,000
 

Peanuts74

2016-08-11 14:36:35
  • #6
What does that make in living space? Between 150 and 160 I assume? That is not exactly small and the plot also makes a difference, as well as additional costs of about 25 k€. Depending on where you build, you can come in well over 100 k cheaper...
 

Similar topics
17.04.2016Value of land and bungalow B5511
02.09.2013Angular bungalow on 800m² plot - financially feasible?16
03.06.2013Buying land from father - building a house yes or no?11
09.02.2014Bungalow Floor Plan Draft Opinions22
23.12.2014Bungalow on fire wall32
08.01.2015Opinions on the bungalow floor plan42
26.03.2015Single-family house 160 sqm first consideration regarding the location on the property22
22.07.2015Draft floor plan bungalow - Your opinions please!14
23.12.2020Heritable lease property the only solution?53
04.03.2016Bungalow - 2 floors with large layout / 3 floors with small layout?11
11.10.2016Barrier-free building - bungalow or house with stairlift?18
19.01.2017Floor plan design 160sqm bungalow28
28.05.2018Construction costs mini-bungalow (approx. 50m²)54
04.05.2017Evolith-168sqm bungalow white plaster with gray-black shingles28
07.04.2017Is a bungalow possible on a slope of around 20%?12
08.06.2018130 m² bungalow with double carport on a 600 m² plot?64
16.03.2018Old building on property - Bungalow extension - Various problems10
16.10.2019Bungalow - does it make sense on a plot like this?21
26.03.2021Floor plan of a bungalow on already used land108
30.09.2024Floor plan bungalow 125 sqm conical plot39

Oben