Floor plan design for a two-family house on a slope

  • Erstellt am 2017-05-16 14:23:17

sichtbeton82

2019-07-08 07:39:15
  • #1
Friday and Saturday were two exhausting but also very wonderful days. The female offspring is definitely interested in the construction site, but the son's workload is untouchable. He worked hard like a grown-up. On Friday after daycare from 1 p.m. to 9:30 p.m. and on Saturday from 9 a.m. to 7 p.m. He would have worked longer on Saturday, but we had to go home. They were certainly some of the best days of his still young life.

There was a great atmosphere on the construction site and everything was in harmony.

We welded the connections from the basement (heat pump) to the geothermal distributor. Next, the four individual circuits (each 300m) have to be laid and then welded.

The first batch of drinks for the upcoming topping-out ceremony has also been procured.






 

rick2018

2019-07-08 07:52:25
  • #2
This will truly become a shared home. Wishing you continued good progress in construction.
 

sichtbeton82

2019-07-10 07:34:40
  • #3
Oh, how wonderful, progress is being made. Well, the garden landscaping will take a bit longer, but thanks to family support, it won't be more expensive at least. The extra cost for vehicle rentals is offset by labor hours done in-house.

All the "small" windows and the front doors are installed. Now the important thing is the large windows, especially in the basement. Because there the vapor barrier has to be installed before starting with the screed.

Sanitary work started yesterday. At the same time, the balconies were sealed yesterday as well.





 

Muc1985

2019-07-10 07:52:26
  • #4
Really great progress and very nice to see how the whole family works together and sticks together.

Keep it up!
 

haydee

2019-07-10 09:04:20
  • #5
Nice how it continues.

Then involve the female offspring as well. It is up to the fathers whether girls can handle hammer, drill, and so on.
My little one loves everything that can be worked on with hammer and screwdriver. She is really good at it too.
 

sichtbeton82

2019-07-11 06:46:14
  • #6
Very good point. In general, my female offspring is allowed to do "everything" as well. Even at a young age, she helped me with car repairs. Getting dirty is also encouraged. However, during the recent hot days, she preferred to spend time in the water rather than on the construction site. Yesterday, they installed a Christmas tree. I didn’t notice it while compacting and was quite surprised when I saw the result. Both of them went off, grabbed the branch and the piece of insulation, worked on it with the hammer, and straightened the tree. Probably because we mentioned in the morning before daycare that we would celebrate Christmas in the new house...


 

Similar topics
02.02.2009Building materials are stolen at the construction site12
27.02.2015Burglary-proof windows?33
03.06.2014Interior design - windows14
16.01.2018Is an extra charge for colored windows realistic?19
18.06.2014Inspector defect identification, determination of window installation10
18.05.2016Help needed with window arrangement!32
27.05.2015Huge problem with condensation on the window34
20.12.2019Trefz window prices and experiences?14
26.01.2015Window between two rooms13
13.03.2015Opinions on window parapet height sought30
09.04.2015For porthole, special regulations? Window, single-family house 1.5 stories.18
22.04.2015Window, roller shutter, exterior plaster10
28.05.2015Round window - dissatisfied with the interior reveal16
27.05.2015Which roller shutters with a closed window, only glazing?13
11.10.2018Waste on the construction site - What is tolerable?138
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
18.10.2020Window & door installation not compliant with standards28
19.08.2021House building - an eternal construction site?33
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13

Oben