Correct, there was one or more artists. They had sprayed L-bricks, which were temporarily parked outside the property in a field (agreed with the owner). Fortunately, the sun is shining today and tomorrow. With rain, it almost becomes impossible to wheelbarrow. Let's see how much we get done. The goal is to cover the upper terrace with topsoil. Probably about 100m² of lawn will go there, the rest paved or with slabs. Fill height about 30 cm. That means 30m³, about 300 wheelbarrow trips. One is already ready .
PS: The sliding lift doors are now finally installed in the correct size. The plasterer is starting.
Wow, that took a lot of work, Hang is simply many times more elaborate. This is going to be amazing, I'm curious to see how it looks in the end, I always look forward to you posting pictures.