Still good construction The weather is right now We wanted to have moved in by Christmas 16, it became Fasching 18 The outdoor area is still mostly missing and the roof cellar
I always get a bit scared from 1m height . Climbing down the ladder requires the greatest courage from me. Even the famous 10 horses wouldn't be able to get me into the excavator.
Concrete walls were erected. It's a pity that these are the concentration camps. Otherwise, we would have left the concrete surface (that is, without plaster, wallpaper or anything else).
Is insulation still going on? Our hillside concrete wall was insulated from the inside. Sounds familiar to me. I don’t think I would have gone into the excavation pit. The plasterers specially built me a mobile staircase in there, otherwise I wouldn’t have been able to ventilate for screed drying. I can’t get to another floor by ladder.
Insulation is still to come! First (e.g.) black putty for bonding the insulation. As insulation on the outside, 120mm extruded polystyrene rigid foam boards.
The soundproofing plans for the outside stairs are now also finished. Soon, access using a ladder will no longer be necessary.