Yes, it actually meets quite a few "wishes." I need to think about it for a few days. But at first glance, I'm not sure if I like the location of one of the children's rooms and the utility room.
 

haydee

2018-04-30 22:18:59
  • #2
Take a look further down in the financing section, there are threads about incidental building costs or why building a house always gets more expensive.

You have to gather all costs, including all your building materials for the self-performed work. It is somewhat tedious for you because of the extensive self-performance.

Do you have many helpers who have preferably learned the trade? A lot of time is spent on that in construction.
With our house-building company, there was a young couple who had a shell structure erected in 2015. The rest was intended to be finished by the man and his father. They moved in at Easter 2018.
 

haydee

2018-04-30 22:22:25
  • #3


The utility room is actually quite well located. You can still swap rooms.
 

Grit Stephan

2018-04-30 22:49:22
  • #4


So we have calculated the material for the self-performed work. But good point.
And that is exactly where many misjudge, because it is really “crazy” how much quickly adds up.
However, a good buffer is still planned here.
And the second mistake you can make here: or rather many make: not sticking to your own plan.
Like for example, “You only build once” and then a few euros more here and a few euros more there...
 

haydee

2018-04-30 22:53:00
  • #5
Yes, you only build once, it costs money. But all the ancillary construction costs are expensive. What does the man say, not another building owner unit (1,000 euros)
 

Nordlys

2018-04-30 23:40:54
  • #6
Secondary construction costs, we need to bring some order into this. For us. House turnkey 163. Extra wishes and garage 11. Kitchen 4500, garden and paving 15, painting and floors 10. Total house thus about 203. Additional costs. For us earthworks extra 7, telecom and gas water sewage electricity 9, permits insurances 1, surveyor and cadastral office surveying 1, blinds 1, moving 1, topping-out ceremony 0.5, construction power and water 0.5 gives 21 Total house without land completely 224. Plus land 68. Total 292 with everything really ready to move in. Karsten
 

Similar topics
20.07.2011House construction: Equity / incidental construction costs realistic?14
18.10.2012Ancillary construction costs and general expenses for a new semi-detached house14
18.06.2013Too few incidental construction costs or is the cost breakdown okay?16
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
13.03.2014Additional construction costs and realistic additional construction costs?21
11.10.2022List of incidental construction costs. More expensive "on the builder's side"?154
19.08.2014Home construction financing - House price and ancillary construction costs27
26.04.2016Estimation of construction costs (and ancillary construction costs)11
23.06.2016Additional construction costs ... but which ones?39
16.10.2016Construction ancillary costs not visible?14
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
18.05.2018Construction costs for a single-family house, additional building costs?24
17.09.2020House connection pillar in the garden vs. house connection directly in the utility room35
18.10.2020Baunebenkosten calculation realistic?94
13.10.2020Land available - ancillary construction costs, ancillary house costs, financing?34
10.12.2020Assessment of Additional Construction Costs - Have I considered everything?34
14.01.2021URGENT: Plausibility Check of Additional Construction Costs - 2 Days Before Deadline43
02.02.2022Own work in new construction - what makes sense and is feasible?66
06.02.2022Are additional construction costs realistic? - 175m² living area KfW 5515