Umbau-Susi
2016-05-07 18:24:31
- #1
Purchased in December 2011, taken into possession in July 2012, renovated with gutting and interior reconstruction until moving in in March 2013. Most of the work we did ourselves during the gutting until the end of November, actually everything except the pipes of the gravity heating system was done by us. Everything new was then installed and built by the respective trades as a winter construction project.