I'll give you my two cents:
Shell construction with plaster and screed 150,000 (incl. groundworks) => I find this relatively high, considering that plaster and screed cost less than 40k€ and you have drywall in the upper floor. I would get another offer here. My feeling tells me that you could come out about 10-15k€ lower.
Roof 40,000 => I'm not really familiar with 1.5-storey houses. But we have a cold roof with 24cm ceiling insulation on the upper floor (invoice paid 2 weeks ago 20k€). Also, I assume parts of the drywall are included here. So get a 2nd or 3rd quote.
Drywall 30,000 0 => I can't judge, I have no drywall.
Wood stove 10,000 => Wood stove and chimney or do you mean such a Schiedel solution? If Schiedel solution (chimney and stove in one), then the price fits.
Windows, doors (wood-aluminum with venetian blinds) 50,000 => As my predecessors said, just downgrade to plastic. We have many windows over 140sqm + sliding lift door + colorful. Invoice 20k€ without interior & exterior door.
Sanitary 40,000 (air-water heat pump, underfloor heating, controlled residential ventilation) without sanitary fittings (we buy those ourselves and have acquaintances install them) => This is a bit tight. Keep 5k€ in mind as a buffer. I suspect that things like outside water tap, laundry basin in the utility room, fridge line are not included. Also, in my case, sanitary fixtures cost only 20% more at the specialist trade (compared to online). That's potential savings, but what are 2k€ on 10k€ for a whole house?
Tiles 10,000 (this is still estimated, offer not yet available) => Uh... since I don't see any flooring position here, I assume a lot will be tiled. I predict now that you will be sick of it and expect 15-20k€.
House connections 10,000 => Fits, possibly -2k€.
Garage door 4,000 => No idea.
Statics 2,400 => That's okay, I paid less. Why your husband has no connections here is beyond me.
Kitchen and carpenter 20,000 (estimated)
Electrical 16,000 => Could fit. You just have to hold back.
Steel stair railing 3,500 => Fits.
And now the possible missing items. What about..?
- Surveying
- Construction site setup (construction road, toilet, electricity meter, etc.)
- Removal of excess soil and disposal
- Construction electricity/construction water
- Scaffolding (often has to be set up twice)
- Window sills inside/outside
- Drainage (inspection shafts, cistern, etc.) and civil engineering
- Energy consultant required for KfW55
- Painting work
- Soil and ground survey reports (are 2 items)
- Exterior facilities (incl. driveway, paths, terrace, fence, plants, bushes, trees)
- Garage/carport
- Landing
- Front door canopy
- If you don't downgrade after all, there will be additional land registry, notary costs.
- Move
- Furniture/furnishing
If all that is clarified, your list would actually be complete.