Is the building plan reliable? When to terminate the rental apartment?

  • Erstellt am 2022-05-14 08:29:54

bauenmk2020

2022-05-14 19:19:36
  • #1

We were told by the main contractor that we had already moved into the house and therefore they no longer wanted to accommodate us regarding the question of the "exceeding of the guaranteed construction time." However, we had only changed the mailbox and set up mail forwarding to the new address.
One could partially accept certain trades or partial areas and document it with a handover protocol signed by both parties.
The important thing is only to record any open issues in a protocol. We then accepted everything except for the points still to be completed. Here we went through the house together with the site manager and DEKRA.

We were able to stay with the parents-in-law during the transition period. We had also taken care of finding a new tenant, so we were fairly free from deadlines, etc. But we could not move directly into the house — especially not with all the household goods.
You basically need a continuous office with PC, printer, scanner, and all the folders. I would rather pay rent for 1-2 months longer or rent a small apartment nearby — for office and sleeping. Children, etc., could perhaps be looked after during vacation at grandma & grandpa’s. Remaining work am in the house usually takes a lot of time anyway, and unfortunately, there is not much time left for the children.
 

Zubi123

2022-05-14 19:26:33
  • #2
From a certain point on, you can pretty much estimate yourself how long the construction work will still take… I would say that after the screed, the 3-month notice period should easily be sufficient in most cases. And even if individual rooms are not yet completely finished, you can probably already live in the new house and don’t have to stay in a hotel.
 

Neubau2022

2022-05-14 19:30:51
  • #3


Not nowadays. That was possible when everything was available. Without a meter cabinet, for example, moving in would be difficult.

In our case, the screed will be poured on Monday. Meter cabinet delivery time is currently 10-12 weeks and it was ordered weeks ago.
 

Hausbautraum20

2022-05-14 19:39:48
  • #4


For us, it was 5 months after the screed. One month was lost because the house connections were not there. But even so, it was still 4 months. The drying time is really very long. And then there’s electrical, plumbing, kitchen, tiling, painting, and flooring. They all have to be done within that time. For example, with us, the kitchen was only measured after the screed had dried, and then the delivery time was added.
 

bauenmk2020

2022-05-14 19:40:19
  • #5
For us, the screed was around June. We then did painting and flooring in November. We moved in December. The final inspection was in September. So a good half year after the screed... thanks to Corona and lockdown :( Instead of "screed finished," I would classically terminate the old apartment according to the following suggestions: * Kitchen installation date fixed * Electrical work finished / usable / remaining work manageable * Sanitary work finished / usable / remaining work manageable * Heating working * Doors and windows (outside) finished Can be terminated. Partly electricians, plumbers, etc. still have keys for construction cylinders. PS: The tiler was the last craftsman for us. Maybe use this trade as a reference?
 

Pinkiponk

2022-05-14 19:52:40
  • #6

For us, all the trades have already been assigned and scheduled. I am rather a bit concerned that they will come in too early and the screed is not completely dry yet.
 

Similar topics
26.04.2016Question about kitchen drainage / piping16
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
12.09.2016Water connection outside from the kitchen - possible?39
17.10.2016Annual depreciation of kitchen on average?22
05.04.2017Super disaster - water pipe burst, screed damp31
27.10.2019Layout Floor plan Multipurpose room Kitchen Living Dining58
15.08.2017Calculation interior finishing: heating, sanitary, bathrooms, floor coverings55
27.02.2018Too high humidity in the apartment. 60-70% in winter33
06.04.2018Floor plan change - Load-bearing walls in the apartment. What to do?14
02.05.2018Is wood parquet recommended on the ground floor and also in the kitchen?26
27.07.2018Is it possible to measure the kitchen in the shell construction after the interior plaster is completed?10
08.07.2019Assessment of floor plan for 3-room apartment73
22.07.2019Drain pipe not under the screed37
22.04.2021Costs for the heating & sanitary trade86
17.12.2020Financial planning with a rented apartment17
23.01.20211.5-room apartment - Kitchen renovation28
10.11.2021Open kitchen: regret or the ultimate experience?104
14.05.2022Old building apartment with gas boiler - underfloor heating now, heat pump later14
18.01.2023Kitchen and storage room apartment floor plan optimization34
09.01.2025Vinyl flooring in the kitchen / Beam ceiling sagged / Should I lay it on tiles?11

Oben