cschiko
2020-06-23 08:21:52
- #1
So a short "update":
The system has been ordered and will be installed by July 13th at the latest. The attic has already been cleared out, and by the weekend at the latest, I will lay the 3x4.0mm² cable from the fuse box to the chimney flues in the basement. They will do the rest of the way since they are coming down there anyway for the condensate drainage. I just have to drill a suitable hole through the approx. 60cm thick former exterior wall.
The system has been ordered and will be installed by July 13th at the latest. The attic has already been cleared out, and by the weekend at the latest, I will lay the 3x4.0mm² cable from the fuse box to the chimney flues in the basement. They will do the rest of the way since they are coming down there anyway for the condensate drainage. I just have to drill a suitable hole through the approx. 60cm thick former exterior wall.