But you left out the most important point. He included the sanitary fittings in that. Then the price can easily come close to that. Sanitary fittings are very expensive. Very basic equipment costs 5,000€. But it quickly goes up to 10,000 to 20,000€ if you’re not careful, if you really have everything done by the plumber.
 

Wastl

2014-10-01 08:52:46
  • #2
Where is the chimney? I can't find it on the plan. Such a chimney can quickly mess everything up for you. You are planning a very open ground floor. A view from the front door to the terrace. Personally, I find that too uncomfortable. I think light wells at terrace doors are annoying. When you step outside, you always stand on a light well. Better to place them to the side. The light well near the entrance door can also cause problems with a large platform. If you plan a bathroom in the basement, you will probably need an expensive lift station. I don't see that in the calculation yet. 310 k€ for so much living space including the basement sounds realistic. Whether the individual trades are correct, I can't tell you.
 

Bauherren2014

2014-10-01 10:36:51
  • #3
I'm not really shocked by the price now either. With the living area + basement, I think that's not too much. What did you expect (or hope for)? I can't tell you if the individual trades are correct, but overall it sounds quite plausible. However, I also find the compilation of the trades somewhat "an acquired taste".
 

Bauherren2014

2014-10-01 10:39:50
  • #4
@ Wastl: Yes, the lifting system is included in the calculation, quite far down. Whether the price is realistic, I have no idea.
 

Bauexperte

2014-10-01 10:49:16
  • #5
Hello,


I have already written that I consider it at first glance as the result of a dice game. For example, I find it strange to calculate the scaffolding service twice – is the scaffolder supposed to dismantle after roofing, only to reassemble again for the exterior plaster? Also, among other things, the costs for the fecal lifting station are not plausible to me – with 2 chopper pumps, the price is set too low.

But to gain certainty, further information is needed: what is planned regarding the equipment, for example sanitary fixtures, electric roller shutters, will the basement be completely finished, does the chimney start from the basement, etc.?

Rhenish greetings
 

milkie

2014-10-01 13:19:26
  • #6
You have over 170sqm plus basement, a crappy bay window for a lot of money, certainly a large corner glazing in the living room, parquet, external blinds, etc., so definitely not a cheap finish! I consider the amount quite realistic! Did you perhaps let yourselves be deceived by the cheap offers like new construction = cheaper than existing property?
 

Similar topics
03.03.2012Position controlled residential ventilation in the underground basement?16
19.04.2013Budget for the construction of a single-family house with a WU concrete basement27
27.05.2015Does an external chimney have to go down to the basement?12
30.09.2015Floor plan of a single-family house with basement19
05.01.2016Chimney drawn incorrectly16
21.02.2016Is wastewater drainage possible in the basement?18
21.05.2016Lifting system backflow plate20
09.09.2016Air intake in light well?36
28.07.2017Calculation / Additional Costs Expansion House28
05.11.2018Do we need a lifting system as the architect suggests?13
02.04.2019Building plot: Massive fill or better basement with excavation?28
12.07.2019Construction costs for a new 150m2 building without a basement in South Baden-Württemberg16
30.08.2019Repurpose chimney - ideas?16
30.09.2019200m2 single-family house for 4-5 people without a basement on a narrow plot67
14.10.2019Floor plan design city villa with basement improvement suggestion?77
07.05.2020Installing controlled residential ventilation in the basement - outdoor air / exhaust air, tips?15
11.08.2020Light shafts in waterproof basement10
27.10.2021Single-family house with basement in NRW - is our financing solid?43
09.09.2020Calculation of a prefabricated house19
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60

Oben