Where exactly have you included construction electricity and water? Where is the rent for the standpipe and construction power box? Where is the consumption?
Where is the drainage included?
Drainage/sewer is a separate item with 6850, if I see that correctly...
But that would be very cheeky if everything else is included, but the connection of the "Regenrinne" to the sewer is not, and this would then cost tens of thousands of €.
Hi, so the connection to the sewer from the gutter is not included. We have to let the water seep away. We wanted to do this through a basin in the garden, at least that’s what we told the building authority.
Hi, so the connection to the channel from the gutter is not included. We have to let the water infiltrate. We wanted to do this via a depression in the garden, at least that’s what we told the building authority.
Well, you still have a big depression, so quite a lot fits in there