I can only agree with that. It very much depends on your own standards, your own effort, and the tradespeople needed for support. Patience and time also play an important role ;) If you have no time besides your regular work, even the best craftsmanship won’t help much. You simply need the time for your own effort. At least that’s our experience. And always plan for unplanned costs with 10%. We had to remove and reinstall the entire ceiling in the extension. That was not apparent beforehand.
Does anyone of you have building plans, plans for wiring, or information about the condition of the building structure, etc.?
If anyone has information about the building type Landskrona from 1973 in the form of building plans, information about the wall structure, the exterior facade, or the installed heating system, I would be happy to hear from you :)
Does anyone of you have building plans, plans for wiring, or information about the condition of the building structure, etc.?
If anyone has information about the building type Landskrona from 1973 in the form of building plans, information about the wall structure, the exterior facade, or the installed heating system, I would be happy to hear from you :)