Overall, I like the design; visually, it's totally my style!

But I find the bedroom way too big. Or are you planning to do something else there besides sleeping? I would first assign the room to the child; that means, conversely, that the children's room should be big enough to comfortably fit a double bed – that should work with 15 sqm. When the child moves out, you can of course enjoy the nice room – although: even then you only sleep in it. I would think of more uses (studio, library, etc.). But the child also uses the room during the day, whereas a bedroom is always empty then. Such a pity for the beautiful space...

Swap the [TK] and the guest toilet. Then the path from the living area to the [Bieselbereich] is shorter and the guest doesn’t have to run all the way to the door. You might still consider implementing that.
 

Malunga

2022-10-12 13:06:33
  • #2

Thanks for your interest :) The bedroom is a bit larger because we plan a kind of walk-through wardrobe in the entrance area. My wife works in shifts. And so we are trying to keep things somewhat separated.

The utility room has been moved to the middle because this is simpler due to the connections. Here, cost/benefit outweighed other considerations. Ultimately, the detailed planning is finished and the child has fallen into the well :)
 

Malunga

2022-11-04 13:19:55
  • #3
Tile installer offers are available. Currently no delivery difficulties. Formats planned with 60x120 (floor and walls bathroom) m2 70€ 80x80 (floor guest WC) m2 50€ Metro (walls guest WC) m2 60€ Offers are at once: 240€ net per m2 (mat. + labor) 216€ net per m2 (see above) Can you confirm this as is?
 

Malunga

2022-11-26 00:49:43
  • #4
Here we go. Only the rain makes things a bit complicated :)
 

Malunga

2023-01-21 16:03:28
  • #5
Foundation base completed, earth conductor wired and first KG pipes connected. Slowly a first impression is taking shape. Now only the outside temperature may rise a bit.
 

Malunga

2023-02-07 19:51:04
  • #6
Another step forward. Ground slab part 1 on the ground floor completed and upstand reinforced and prepared for formwork.

Ground slab part 2 is currently being prepared and the wastewater plan is being consistently implemented.
 

Similar topics
05.02.2016What colors for the bedroom?44
15.02.2015Dressing Room/Bedroom Problem - Floor Plan Discussion25
06.04.2018Floor plan change - Load-bearing walls in the apartment. What to do?14
03.11.2018Moisture in the bedroom on the exterior wall - Where does it come from?10
04.12.2018Toilet window in the guest WC next to the entrance door - is it now a no-go?44
14.10.2019Dampness in the basement on the floor slab and walls25
28.06.2019Guest WC: Lower the ceiling or cover the pipe?16
01.10.2019Soundproof door bedroom / children's room23
09.12.2019Bathtub in the bedroom - what do you think about that?35
27.01.2020Light connection wrong place guest WC29
14.02.2020Example cold water tap for guest WC12
19.02.2020Location of guest WC - entrance area?28
24.04.2020Guest WC (1.65 sqm) and bathroom (4.88 sqm) renovation21
16.05.2020Guest WC arrangement - tips?19
29.04.2021Is it possible to have a window in the guest WC/guest room despite the garage?33
02.07.2021Roller shutters in the guest bathroom, yes or no?35
12.10.2022Planning guest bathroom, need your tips17
15.12.2022Planning guest WC in new construction - How big should it be? (DIN?)107
26.03.2023Floor plan of bedroom with bathroom and dressing room62
10.05.2023Draft designs tiles bathroom / guest toilet19

Oben