KfW funding for KfW 40 Plus houses from now and from 01.07.2021

  • Erstellt am 2021-02-04 18:00:06

Schultes

2021-03-16 19:36:14
  • #1
Program 461, that is the grant program without KfW credit. Our letter does not help you. If you want a legally binding statement from KfW for yourself, then you have to write yourself. Or wait until April, when the [BEG WG Merkblatt] will be published. The [BEG EM Merkblatt] has already been published, as it has been in effect since 01.01.21. The same procedure is described there as KfW answered me to our question. I assume that this will be adopted in the [Merkblatt BEG WG].
 

Evelyn!

2021-03-17 20:06:45
  • #2
Yes, April is not far away anymore and it doesn't look like I could spontaneously sign anywhere :rolleyes:
 

Mimaraa

2021-03-30 15:57:49
  • #3


Regarding the grant without credit according to the "new system" from 01.07.2021:

So I must first have the funding notice and then sign the contract.

What are all the requirements to apply for and receive the funding notice on 01.07.2021? Can I simply do this on 01.07.2021 by submitting to KfW without having done anything before? How long will the funding notice then take?

The disadvantage, of course, is that house prices have risen until July, the start of construction would be delayed to 2022, etc.
 

Schultes

2021-03-30 21:06:37
  • #4
Well, for the application you will need detailed information about your property. That means all the evidence regarding energy demand, now also the ventilation concept, now also detailed thermal bridge coefficients (flat rates as before are no longer acceptable for BEG WG EE). Basically, your house must be fully planned (orientation to the sun, structure of the building envelope, windows and shading, type of heating and heating circuit distribution system, ventilation concept, size of the usable area) in order to determine the required values for the application. And no developer will do that for you if you don't sign a contract....., see description one or two pages before. Btw: If you haven’t signed yet, construction will start in 2022 anyway.
 

Mimaraa

2021-03-30 21:14:28
  • #5


How is this procedure supposed to work if I am only allowed to sign the contract after the funding notice and you claim that the developer will not prepare the things for me before signing?

The timeline is after all

1. Have calculations/plans/values created by the developer
2. Apply for funding notice
3. Sign contract
 

WilderSueden

2021-03-30 21:40:35
  • #6
Planning contracts are already allowed beforehand. Only a contract for work is not possible. Possibly the topic of funding reservation also appears in the contract; for individual measures, that seems to be possible. But fundamentally, this does not change the fact that the order is absolutely nonsensical and unrealistic. And in doing so, it also actively drives the clients into the provision interest because no bank will apply for funding without selling its own loan.
 

Similar topics
16.06.2011Conclude a construction contract under reservation?10
07.04.2016New KfW conditions from 04/201674
26.07.2016Calculation of equity capital in connection with KfW loan28
10.09.2016Construction financing and contract with the developer24
01.05.2021KfW loan + repayment grant for granny flat39
17.10.2020KFW 153 - Repayment grants and maximum loan amounts increase62
16.04.2020Is the KfW loan still salvageable / changeable?10
01.07.2020Financing via KFW 55 or still from the bank?18
09.09.2021Federal funding for efficient buildings (BEG) from Q1 2021240
17.04.2021New KfW Building Loan Conditions17
06.07.2021KfW loan is expected to become cheaper from 01.07.58
30.03.2022Apply for KfW funding 461 and 464?36
09.09.2021KfW 261 if the developer has already applied for funding11
24.04.2022Construction financing 160 sqm single-family house - feasibility assessment113
14.06.2022KfW BEG funding stopped 261, 262, 263, 264, 461, 463, 4641239
29.01.2023KFW Credit 261: New Construction Efficiency House 40 NH17
25.08.2024Extension of deadline for KFW grant variant54
19.07.2024Application KfW 442 Solar Power for Electric Cars42
26.02.2024Energy renovation and extension, KFW 261 example51
22.12.2024Old building - Purchase and renovation with KfW16

Oben