Only the KfW application has to be submitted. After that, you have time.
Ok, thank you very much, I didn't know that. However, we still have a big problem that is worrying us. We planned our house, submitted a confirmation of application (BZA) through an energy consultant, applied for and were approved for a loan, and then signed with the construction company. Now the building application is about to be submitted and it has been noticed that a roof window is missing. Is everything ruined now? The loan? The grant?
During the confirmation of application (BZA), we were told that everything has to be correct there. We would surely meet KfW 55 standards with the roof window, but all the calculated values and the window area do not match.
Unfortunately, I can't reach my consultant and my wife is close to despair.