Hello, our photovoltaic system was installed the day before yesterday and yesterday. Do yourself a favor and size the empty conduits accordingly. We had only planned one M40 conduit for the system and now the dilemma is that 9 cables need to be routed. Currently, the cables are stuck somewhere in the conduit; they won’t move forward or backward. On Monday, the electrician will come back with two people and cable lubricant and try to pull the cables through. If that doesn’t succeed, the cable routing will have to run along the house wall, which of course would be a visual disaster. Therefore, my advice is one M60 conduit per side of the roof.