Initial floor plan on graph paper: slope, basement + 2 floors.

  • Erstellt am 2021-01-02 13:09:25

Crossy

2021-03-10 22:54:48
  • #1
I think you are underestimating the costs of the basement in your calculation. It is completely within the thermal envelope. Even including the garage?
 

Hangman

2021-03-10 23:02:58
  • #2
What I already wrote in post #52... but nobody listens to me :cool:

The basement should be removed from the thermal envelope and the exterior walls should be stacked on top of each other, this should be examined.
 

ypg

2021-03-10 23:21:39
  • #3
I also see the basement as a major financial component. Including garage 100 sqm, which most builders forego and yet still have to pay 400000/450000. Well, and then the edge surcharges...
 

11ant

2021-03-10 23:34:20
  • #4
Well, I also find the stepped return unsuccessful and unnecessary.
 

majuhenema

2021-03-31 23:12:31
  • #5


I’m writing another update.

After the offer with the floor plan from #60, GU1 contacted us on their own initiative to inform us that a calculation error had occurred and they wanted to re-plan. We then received this offer last week.

I reached out to GU2 last weekend since we approved the very good draft for calculation exactly one month ago. They replied that they hadn’t had time for a calculation so far and would now (without specifying a concrete date) start working on it.

We had our initial meeting with GU3 two weeks ago. Our contact there made a good impression, was very knowledgeable, and took time. However, he mentioned about two weeks for the draft and then another two months for the calculation. We have concerns about whether the timing will even work out.
 

majuhenema

2021-04-24 22:00:25
  • #6
We made our decision yesterday. It will be the general contractor who started out with the worst conditions (unknown to us, no "client experience" from friends/acquaintances/new development inquiries, pure recommendation via this forum, initial interview only because another favored general contractor directly declined us). Here, the chemistry was great from the very first meeting. In many respects, we have the impression that the boss is not looking for the easiest solution, but the most sensible one. Even though he was less well received here, the floor plan from #59 remains.
 

Similar topics
08.01.2014Where do we put the house and garage?10
03.02.2014Cost estimate single-family house with garage11
06.04.2014Planning floor plan / first draft for first feedback32
18.06.2014Our floor plan design, your opinions20
30.07.2014Bungalow with 140 sqm and garage in the floor plan13
05.08.2014First offer, 157m2 with basement, KFW 70, garage14
05.11.2014Garage: design possibility of the roof, appearance14
11.03.2015Planning optimal arrangement of house, garage, and driveway13
06.05.2015Draft single-family house with garage/carport - please provide evaluation22
11.06.2015Single-family house with a granny flat & garage14
22.07.2015Draft floor plan bungalow - Your opinions please!14
27.08.20152 full floors, passage to garage, utility room under stairs25
11.09.2015Building a garage on the boundary is not possible according to the architect.11
29.12.2015Single-family house floor plan / garage on the ground floor?10
30.12.2015Floor plan single-family house with garage, self-planning17
28.07.2017Calculation / Additional Costs Expansion House28
15.08.2017Calculation interior finishing: heating, sanitary, bathrooms, floor coverings55
09.09.2020Calculation of a prefabricated house19
12.12.2020Budget calculation single-family house 160 m²13
11.06.2021Is border construction by garage lawful?53

Oben