We also did a cash check just like that yesterday. I am summarizing planned costs and, if there were changes, actual costs.
For a possible comparison, it should be noted that only earthworks, where I did about 35% of the working time myself, and the shell construction / roof beams and exterior doors and windows have been contracted out.
Total costs are planned at €335,000 including a €30,000 buffer.
Plot of land, purchase incidental costs €73,000
Earthworks €17,000
House connections €3,000
Architect and statics €4,000
Small stuff tools €2,500 ________ €4,500
Insulation and formwork €9,500
Wastewater pipes
Underfloor heating and distributor €2,500
Reinforcement grounding ring €2,500 ________ €4,000
Concrete and pump €8,500 ________ €9,500
Shell construction and roof beams €47,000
This is the current status.
Windows and doors have been ordered and measured.
Planned were €26,000 including interior doors,
now with a different HT or interior doors €25,000
Olli
For a possible comparison, it should be noted that only earthworks, where I did about 35% of the working time myself, and the shell construction / roof beams and exterior doors and windows have been contracted out.
Total costs are planned at €335,000 including a €30,000 buffer.
Plot of land, purchase incidental costs €73,000
Earthworks €17,000
House connections €3,000
Architect and statics €4,000
Small stuff tools €2,500 ________ €4,500
Insulation and formwork €9,500
Wastewater pipes
Underfloor heating and distributor €2,500
Reinforcement grounding ring €2,500 ________ €4,000
Concrete and pump €8,500 ________ €9,500
Shell construction and roof beams €47,000
This is the current status.
Windows and doors have been ordered and measured.
Planned were €26,000 including interior doors,
now with a different HT or interior doors €25,000