City villa floor plan - suggestions for changes?

  • Erstellt am 2019-10-11 22:17:25

kaho674

2019-10-18 08:21:20
  • #1

I meant in the extension the bedrooms still need to be moved so that the wardrobe can stand behind there.
 

Laufi92

2019-10-18 08:25:00
  • #2
I just have concerns that the space around the bed might then become too tight.
 

kaho674

2019-10-18 08:29:14
  • #3
What is KBE?:
= Colony Forming Unit
= Catholic Federal Working Group for Adult Education
= Cologne Bonn Railway AG
= Competence Center for Collection Preservation
= Municipal Participation Company mbH of Envia
= Component-Based Development
= KBE 50-2 M Eco-Magnetic Core Drilling Machine
???
 

kaho674

2019-10-18 08:30:17
  • #4
Nope.
 

Laufi92

2019-10-18 08:33:15
  • #5
EXACTLY what I thought already haha. But it apparently stands for "Controlled ventilation system" I just had another idea. Technical room accessible from the granny flat. So also usable as an additional storage room. Now it’s just a bit tricky to implement. If you simply remove the wall between the tiny storage room and the technical room, you basically have a long corridor. Although you could also fit lots of shelves there. And we would save the 3rd!! front door (to the technical room)
 

Laufi92

2019-10-18 08:36:07
  • #6

 

Similar topics
08.04.2015Install a technical room in the garage? Is this possible?35
15.08.2016Technical room as small as possible - under the stairs?10
19.08.2017Technical room before installing screed: should the technology be painted now or later?16
30.08.2017Technical room boundary construction, air source heat pump suction49
18.09.2017Underfloor heating also in the technical room / utility room19
08.02.2018Is the utility room sufficient as a storage room as well?22
12.08.2019Optimal size and position of the technical room11
01.01.2020Technical room next to the bedroom23
27.09.2020Sound insulation of geothermal heat pump in the technical room17
14.12.2022House connection planning and technical room in the basement11
07.05.2024Door contact cable laid into the technical room21

Oben