Lupfer1
2022-03-12 17:47:55
- #1
Quick question: What does the construction service specification say about the earthworks? That will be the most expensive forgotten item.
I quote from the construction service specification:
"Earthworks:
The native soil is stripped in a thickness of 20-30cm and stored on the construction site on the side. The size of the spoil area is usually determined by the site management to be about 5m beyond the future house edges.
In the case of construction with a basement, the earthworks are carried out as follows:
Excavation of the foundation pit Homogeneous Area I.A according to DIN18300 down to the lower edge of the floor slab, including lateral storage on the construction site. The slope angles and the working space comply with the regulations of the Construction Professional Association.
The backfilling of the foundation pit is carried out after completion of the basement structure with the excavated material stored on the side up to the level of the existing terrain.
A prerequisite is the suitability of the material for backfilling and compaction.
The removal of excess excavated material and its disposal as well as the delivery of additional fill material is included in the price.
A prerequisite for the construction of the basement is a groundwater level at least 0.5m below the bottom of the excavation.
If water retention measures are necessary due to local conditions, these must be agreed upon additionally after examining the local situation.
An assessment of the soil usually takes place by obtaining a soil report. This service is not included in the offer price. If sufficient information about the ground is available (e.g. information from neighboring buildings), the soil report can be waived. The preparation of a soil report is not mandatory according to building regulations. The bottom of the excavation pit is visually assessed by our site managers.
Any necessary soil replacement measures below the aforementioned depth are not included in the offer. Excavation of the strip foundations of the garage or outbuildings including lateral storage and backfilling below the floor slab with material stored on-site is included in the offer.
The design of the outdoor facilities is the responsibility of the builder and is not included in the offer price. (See also point Outdoor Facilities)"