I quote from the construction service specification:
"Earthworks:
The native soil is stripped in a thickness of 20-30cm and stored on the construction site on the side. The size of the spoil area is usually determined by the site management to be about 5m beyond the future house edges.
In the case of construction with a basement, the earthworks are carried out as follows:
Excavation of the foundation pit Homogeneous Area I.A according to DIN18300 down to the lower edge of the floor slab, including lateral storage on the construction site. The slope angles and the working space comply with the regulations of the Construction Professional Association.
The backfilling of the foundation pit is carried out after completion of the basement structure with the excavated material stored on the side up to the level of the existing terrain.
A prerequisite is the suitability of the material for backfilling and compaction.
The removal of excess excavated material and its disposal as well as the delivery of additional fill material is included in the price.
A prerequisite for the construction of the basement is a groundwater level at least 0.5m below the bottom of the excavation.
If water retention measures are necessary due to local conditions, these must be agreed upon additionally after examining the local situation.
An assessment of the soil usually takes place by obtaining a soil report. This service is not included in the offer price. If sufficient information about the ground is available (e.g. information from neighboring buildings), the soil report can be waived. The preparation of a soil report is not mandatory according to building regulations. The bottom of the excavation pit is visually assessed by our site managers.

Any necessary soil replacement measures below the aforementioned depth are not included in the offer. Excavation of the strip foundations of the garage or outbuildings including lateral storage and backfilling below the floor slab with material stored on-site is included in the offer.
The design of the outdoor facilities is the responsibility of the builder and is not included in the offer price. (See also point Outdoor Facilities)"
 

nagner99

2022-03-12 17:54:10
  • #2

That sounds very good. I wouldn’t have thought that is included in the price.
 

Hausbautraum20

2022-03-12 18:26:57
  • #3
Sounds really good!
Soil replacement could theoretically still be necessary, but for us, the described positions were sufficient.
 

Lupfer1

2022-03-12 19:49:07
  • #4


Yes, unfortunately, I am asking myself that question too, or rather trying to estimate what else might be added.

"I hope the fireplace is purely for coziness, plays no relevant role for the heating (calculation), and could also be reserved for retrofitting."

Yes, it is basically "decoration". At least that was the case for the energy consultant, and it will not be executed by the BU either. He only omits the underfloor heating below it and makes the cleaning doors on the chimney for the chimney sweep in the basement and the attic.

"Best if you show the draft in a new linked thread here (so that the completed questionnaire can be in the opening post), because otherwise our ideas of complexity are mostly guesswork; and also add the construction performance specification. With the previous vague information, one can basically only wish good luck, but offer few hints with substance."

Do you mean the questionnaire?

My sketches and what ultimately came of them see below:
 

SoL

2022-03-12 20:07:25
  • #5
The floor plan wouldn’t be my favorite because of all the corners, but it doesn’t have to be. :) Maybe consider making the equipment room accessible from [Keller 2]. That way you can save yourself the dark mini hallway. Something like that can still be changed quite easily.

But: The built-in desk in the office is totally my thing, great idea :D
 

Hausbautraum20

2022-03-12 20:27:18
  • #6
I like it a lot :)

There is no window in the dressing room, but there are worse things.

With kfw55, fireplace, and double garage, there are actually bigger cost factors.
Altogether also 7 light wells, many rooms, many doors, and a sliding door to the kitchen, which alone cost us 1500€.
 

Similar topics
26.10.2012External perimeter insulation floor slab, basement mold risk11
09.06.2013Costs of earthworks without basement15
22.08.2013Are the estimated costs of the general contractor for earthworks reasonable?12
28.06.2017Basement costs - Is the floor slab offset?17
15.03.2018When is a slope a slope? Basement vs. slab19
14.03.2018Slight slope, building with a basement or a floor slab?16
03.03.2018Price difference between ground slab and basement. Can it be estimated?32
29.10.2018Earthworks in the construction performance description17
14.10.2019Dampness in the basement on the floor slab and walls25
12.07.2019Construction costs for a new 150m2 building without a basement in South Baden-Württemberg16
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
23.01.2020Construction work description - Thin slab foundation disadvantageous?11
08.09.2020Earthworks costs, hillside house14
11.01.2021Basement or slab? - Cost estimation24
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
11.03.2021Building description for a single-family house with a basement42
22.09.2021Is the basement cost estimate realistic?32
18.10.2021Floor plan of a single-family house, 2 floors with basement, approx. 190 m², plot approx. 440 m²78
22.09.2022Basement without additional flooring / cleaning floor slab34
03.03.2024Basement or ground slab: which is more sensible for the property situation?55

Oben