Additional construction costs when building a house with a developer

  • Erstellt am 2022-03-12 00:02:45

Lupfer1

2022-03-12 14:49:49
  • #1


What does construction service description mean? Unfortunately, the abbreviation doesn’t mean anything to me.
 

WilderSueden

2022-03-12 14:52:00
  • #2
Construction service description

word word word word
 

Lupfer1

2022-03-12 15:20:19
  • #3


Oh, thanks. The construction description is not available online. I would say it’s a mix of copy & paste from his standard descriptions and then the things we basically specified. For example, how the shower should be executed, etc. For the heat pump and ventilation system, for instance, we gave him free rein because he said he wanted to install his standard types anyway. Depending on the living area, the type is chosen, but otherwise it’s basically mostly the same. I don’t mind that either.

So, the house is not a "catalog" build in that sense. We gave him sketches so he knew what we wanted, and based on the sketches, the design drawings with accurate dimensions were made for us. As a layperson, you don’t really know exactly how long the staircase will be, etc. So he had to finalize our sketches first. As a result, the external dimensions ultimately increased, because otherwise the room layout wouldn’t have worked out, and accordingly the price increased compared to the first offer and construction description. However, at that point, he was still assuming the external dimensions from our sketches. The loan application was already made before we had the final price.
 

Bertram100

2022-03-12 15:34:20
  • #4
You simply planned the house yourselves?
 

Lupfer1

2022-03-12 15:41:43
  • #5


With the program "Sweet Home 3D" we simply drew the whole thing and oriented ourselves a bit on the floor plan of acquaintances. Of course, now it’s no longer exactly as we drew it. For example, the technical room is now somewhere else. We also forgot one thing or another. The garage is different too, etc., but more or less the design or designs (since there were several) are like how we drew them.
 

Hausbautraum20

2022-03-12 15:49:47
  • #6
We also planned our house completely by ourselves and have been completely satisfied so far, so why not?

The measurement by the construction company and the surveying are different things.
You have to pay for the surveying by the surveying office yourself.

If it’s about the loan, I would plan more buffer, that reduces the stress.
Just ask.
If it goes well, then you do the driveway right away, otherwise later.

Overall an incredible price. Either lucky or something will still come up.
 

Similar topics
18.07.2012What should be considered in a construction service description?10
19.03.2014Comparison of construction performance description! What should we prefer?47
01.12.2016Construction company rejects change requests in construction service description and construction contract39
13.03.2017Construction planning, construction work description, cost breakdown19
27.10.2017Construction description by architects: Who has experience?13
01.12.2017The bank may want a construction service description despite individual subcontract awarding26
31.03.2018Prices have been lumped after modification ideas of the construction service description10
01.08.2018Description of construction services - Performance assessment?12
29.10.2018Earthworks in the construction performance description17
12.04.2019Is the construction performance description detailed enough?14
14.11.2019Have you understood your construction service description?49
23.01.2020Construction work description - Thin slab foundation disadvantageous?11
17.04.2020Construction Performance Description Formulation13
11.06.2021Construction performance description from the favorite - Is something missing?65
24.04.2022Comparison of construction work description regarding the base slab17
10.08.2022Foundation cushioning Town & Country house construction service description10
16.08.2022Evaluation of Offer + Construction Description of New Bungalow29
18.06.2023Assessment of offer, description of construction services12
18.03.2025Overview of the offer and construction work description20

Oben