Turnkey Construction Land and Prices

  • Erstellt am 2015-07-13 09:47:26

schubert79

2016-03-30 18:20:22
  • #1
I don't see anything alive?..
 

Legurit

2016-03-30 18:22:49
  • #2
I am always jealous of the beautiful outskirts with a distant view... well - the second house
 

DDre

2016-06-02 11:32:25
  • #3
By "active" I meant more that work has started to develop the building area...

Our terrace will be oriented to the south side, so there will be nice sun from morning until evening.
We will have a distant view for about 4-5 years, but then the next area will probably be connected.

- Archaeological work is completed
- Plot certified by the notary and purchased
- Sample selection at Danwood on 02.07
- Base slab installation appointment beginning of November
- House installation appointment mid-November
- Move into the house currently planned for the end of December

6x9m garage, landscaping, 90m² paving, terrace and other odds and ends will follow in 2017...

There will be news when it gets started...
 

Basti2709

2016-06-02 12:06:20
  • #4


We also have a south-facing terrace... at the end of May with temperatures around 10:00 to 18:00 it was already practically unusable... We have now set up a 3 meter sun umbrella for the time being... it's somewhat bearable now... but we haven't had a proper summer yet... We will have to install a roof or something similar later.
 

DDre

2016-06-02 12:20:45
  • #5
Our terrace is of course also planned with a roof and integrated sun sails so that we can use it; if necessary, there is also the idea of relocating the terrace on the south side with a corner around the house to the east side in order to be able to use this side even in extreme heat.
 

DDre

2017-02-24 18:14:38
  • #6
Haven't checked in for a long time, but just a quick post about our own home project.

After numerous additions to our house, we have now completed everything since the end of December and received our house installation appointment for 04/05/2017 with a construction period of 5-6 weeks.

The earthworks were completed this week so that the foundation slab can be poured next Monday.

On 03/09, the geothermal baskets and all the other little things that go along with it will be installed...

With that in mind, have a nice weekend.
 

Similar topics
22.01.2019Terrace with Plenera decking32
17.12.2013Floor plan single-family house with double garage and terrace19
18.01.2015Walkable garage (terrace)11
16.02.2015Exchange of experience in terrace use / roofing13
25.02.2015Terrace with corner slabs (L-shape). Implementation of slope12
20.07.2015Have a terrace built11
22.02.2016Terrace on flat roof - structure - covering12
20.02.2018Foundation/Substrate WPC Terrace36
26.06.2016Terrace and driveway55
18.09.2016Terrace on the garage is only partially approved11
24.03.2022Terrace on a hillside on stilts - wood or steel better?38
19.02.2020Planning terrace and roofing50
08.06.2020Terrace roofing city villa19
13.02.2023Bavaria: Consideration of covered terrace in floor area ratio11
18.11.2020Installation appointment rescheduled because the window color is incorrect35
10.09.2021Terrace direction, roofing yes/no12
17.01.2023Sealing transition between ground slab and wall to the soil15
03.03.2024Basement or ground slab: which is more sensible for the property situation?55
09.02.2024Terrace shading - roofing, awning, etc.43