You won't be able to get a concrete staircase in anymore. Take the stairs, whether wood or steel, with risers, then they are sealed as well.
 

11ant

2019-10-27 23:43:22
  • #2
That and the description in post #42 sound as if you have not yet seen any plans and have only wandered through the shell of the building (?) I still lack a visual idea of what the "masonry stairway" might look like in your current house.
 

Sternchen31

2019-10-27 23:54:08
  • #3


I didn’t mean masonry, but concrete. But what does that have to do with the new build, or is this about the statement "masonry"? I can gladly take a photo tomorrow.

As I already wrote, we have had the exposé for the semi-detached house for a few days and the appointment with the company will take place in a few days. I also already mentioned that we have not been on the plot or in the shell construction, and therefore I only have a few pictures of the exterior view. I just don’t want to post an exposé here that we received for review, hence my attempt to explain it this way.
 

Sternchen31

2019-10-28 00:00:04
  • #4


I have already looked into what options are available over the past few days and would do it that way.
 

11ant

2019-10-28 00:15:36
  • #5
Oh, I see. The phrasing "gemauert" had made me curious about what might possibly look like it was built with bricks. Of course, I know a concrete staircase, that's a fairly common standard.
 

Sternchen31

2019-11-07 23:11:42
  • #6
Hello everyone,

I haven’t been able to get in touch much over the past few days because we were suddenly offered a building plot. However, that fell through because we decided on the semi-detached house. Today we had a longer meeting with the developer and the construction manager, and we now have the submission plans. Can I also upload these here to get your opinions? The construction description will still be changed, as the developer made some changes and the changes we requested will also be included. I would like to upload the construction description here as well.

In the next few days, we will receive a new cost breakdown to see what the bottom line is to be paid, including our requests. A preliminary contract will then be made in which it is confirmed that we want these change requests implemented as agreed once the notarized purchase contract is completed, since the construction work will continue while we have to wait for the purchase contract to become legally binding. Currently, the electrician is in the house and is already implementing our wishes; the sanitary installations will be done over the next two weeks. The bathroom will now be designed as we would like it.

A decentralized ventilation system is also planned in the house, which we would like to cancel. According to the developer, the energy consultant must check whether this is necessary to achieve KFW 55 or not; this depends on how the calculation for KFW 55 was made.

Can I post all these questions here and continue the discussion, or should I post the topics in another subforum?
 

Similar topics
19.06.2009Evaluation of the KfW 60 House Contract: Credit Check for House12
19.01.2013KfW 70 - which roller shutters in the new city villa?10
07.10.2016Which heating is recommended for KfW 55?58
06.05.2012Cost for semi-detached house11
03.08.2012Contract Supplement to the Construction Contract by the Developer36
27.07.2013Average construction time for a semi-detached house with a basement11
15.11.2013Build a semi-detached house with different developers?10
01.12.2014Real estate transfer tax / what is the tax applied to? Which developer MUST?30
23.06.2014Developer charges heavily for replanning - justified?12
01.03.2015The developer does not build according to the plan14
07.04.2015Loans and Construction Credit - Creating KfW Usage Evidence11
13.06.2015New construction with developer / construction drawing documents23
03.08.2015Semi-detached house with 2 residential units KFW10
11.09.2016KfW - Construction supervision / verification / acceptance23
22.12.2015KFW 70 funding still in 201524
19.09.2016Is financing for an architect-designed house possible without KfW?12
17.04.2021New KfW Building Loan Conditions17
09.09.2021KfW 261 if the developer has already applied for funding11
12.11.2021Exclusion of funding / Purchase contract signed before KFW grant10
02.01.2025Cost estimate for renovating a 1970s semi-detached house according to KfW or BAFA38

Oben