K a t j a
2022-12-03 12:19:01
- #1
In-house waterworks is planned at the top right on the other side of the threshing floor in the basement.
Since only cold water and the heating are to take place in the new living area, you can plan freely there.
In the existing building, I would first clarify the connections exactly before designing wildly. How and where are water disposal, drinking water connection, possibly gas?