How much additional cost according to the structural engineer's calculation?

  • Erstellt am 2023-06-11 11:17:12

Lauralila88

2023-06-19 20:49:34
  • #1
a bitumen coating is not equivalent to a black tank
 

Lauralila88

2023-06-19 20:50:35
  • #2
included in the house price was bitumen coating with drainage
 

Lauralila88

2023-06-19 20:51:35
  • #3


How much financial reserve should we have for this property?
 

WilderSueden

2023-06-19 21:19:03
  • #4
I say off the cuff, for 150 sqm with a full basement and waterproof tank in the earthquake zone (on the Alb or in the west?) 550k ready to move in is certainly realistic. Without land, without outdoor facilities, without kitchen. Depending on the exact equipment a little more or less. For 450k you certainly won’t get it built.
 

Lauralila88

2023-06-19 21:23:56
  • #5
in the west. we are in the west. ok, 550,000 and are no additional construction costs included like e.g. soil disposal?
 

Zaba123

2023-06-19 21:42:47
  • #6

But that is exactly the waterproofing of a so-called "black tank".

Good luck
 

Similar topics
19.04.2015Concealed fittings bathtub with hand shower11
24.08.2021Slope position, basement open at the front, bathtub31
09.11.2016white tank as living space11
10.01.2017Ideal Standard Bathtub Hotline13
15.07.2020Basement as a white tank - heating?!16
20.05.2014Should I choose an acrylic or steel enamel bathtub?10
22.09.2022Freestanding Tub - Pros and Cons15
28.01.2023Low concrete cover in the basement "white tank"12
06.04.2023White tub - Water exposure class W2.2-E19
23.02.2024Retrofit bathtub or shower?27
03.04.2024Looking for information on basements with a white tank11

Oben