Really difficult situation... We want to continue with it. We feel like we have planned everything but still more or less have nothing. Construction is expected to start in August. All trades are to be awarded individually. I have found companies for each trade and have also received offers. I have received the financing commitment from the bank at about 1.38% fixed for 10 years, which I also have to sign soon and cannot postpone any longer. KfW55 also has to be completed by January 2024, otherwise the subsidy will be lost. That means if I wait, the new loan and missing subsidy will definitely result in about €35,000-40,000 more costs for the house.
About the construction itself: Masons and carpenters work on a time and material basis (they are not direct acquaintances, but we know each other). Building materials are provided through a building materials dealer. Heating, building services, and electrical/photovoltaic work are also done by known craftsmen on a time and material basis.
Ultimately, it always comes down to the same thing: the real price at the later order unless I order now and stock it myself (which I cannot do). For example, windows: should I order blindly now without measurement because I have to fear that they might be 10% more expensive if needed later? It’s the same with other things in interior finishing. This uncertainty and lack of planning ability eat away at me the most.
About the construction itself: Masons and carpenters work on a time and material basis (they are not direct acquaintances, but we know each other). Building materials are provided through a building materials dealer. Heating, building services, and electrical/photovoltaic work are also done by known craftsmen on a time and material basis.
Ultimately, it always comes down to the same thing: the real price at the later order unless I order now and stock it myself (which I cannot do). For example, windows: should I order blindly now without measurement because I have to fear that they might be 10% more expensive if needed later? It’s the same with other things in interior finishing. This uncertainty and lack of planning ability eat away at me the most.