House manufacturer threatens to stop work

  • Erstellt am 2021-11-25 10:22:17

11ant

2021-12-03 10:08:57
  • #1
Well, participation in discussions by thread starters can sometimes be helpful ... :) That is not so easy with a "prefabricated" house - my question the OP has meanwhile "answered" insofar as to open a thread https://www.hausbau-forum.de/threads/sonnleitner-holzbauwerke-erfahrungen.41963/ concerning a timber prefabricated builder.
 

Tassimat

2021-12-03 10:59:27
  • #2
Thank you for the link. But somehow I still doubt that the description of the managing director of this building fits the company from the other thread. After all, the company there builds 80 houses a year with 250 employees. On the other hand, I also read in the linked posts that it is common for the client to organize accommodation for craftsmen. That, in turn, would fit.
 

WilderSueden

2021-12-03 12:58:50
  • #3
Massive botching and lack of planning can also occur in larger companies. Friends built with a major prefabricated house manufacturer... for them it started with logistics being overwhelmed by 2 construction sites in the same area and both the heating system and screed being delivered to the wrong house. The basement with a white tank was not watertight, when the house was erected there were walls inside that did not belong there, the correct staircase was installed after the third attempt, the doors are the wrong ones and after moving in the circuit breakers now trip when the dishwasher and TV run at the same time...
 

SuJaDe1

2022-01-24 20:48:56
  • #4
Hello,
due to illness and work-related reasons, I was somewhat out of commission. Sorry.
Current status:
- Work continued until 12/21
- Building acceptance on 12/23 with the following defects
Wrong balcony and balcony covering not applied
Air shaft instead of light shaft (balcony runs directly over light shaft)
Interior staircase not delivered (upper floor therefore not ready for occupancy and uninhabitable)
Front door without electrification
Emergency exit/emergency crank not present
Small remaining work (acrylic, some molding,
transition house/basement not plastered

As a defect retention for the new additional defects (missing interior staircase, air shaft, faulty front door, other remaining defects), €20,000 was agreed upon. For the faulty balcony, we had already made a retention at the payment for the shell acceptance. The final payment was made minus the defect retention and without the supplementary claims which we consider unjustified.

The delivery of the interior staircase was originally promised for calendar week 51, in calendar week 51 the delivery was promised for calendar week 2. In calendar week 2 the delivery was promised for calendar week 3 and now it has been announced that the interior staircase will not be delivered until full payment is made. That means we essentially have a move-in ready house but cannot move in because the upper floor is not habitable. The access to the upper floor is via scaffolding with a "chicken ladder." The passage upwards measures 55 cm in width and 70 cm in depth. Furniture cannot be transported or assembled.

Since last week there is an extension from the lawyer until 02/02. Today we received information that the remaining work will allegedly be completed on 02/01 and 02/02, but not the interior staircase. The front door is supposed to be repaired in calendar week 9 and there is no date for the interior staircase and the balcony covering.

By the way, the suspicion was correct, it is the company Sonnleitner. Definitely not recommended. I think there are plenty of alternatives.

Many thanks for your suggestions and thoughts.
 

Bauherr_X

2022-04-01 18:33:09
  • #5
Hello SuJaDe1,

we can fully understand the situation, but we are not yet as far along as you are. What is happening there is truly incredible. At least you already have your walls.
Hang in there!
 

Similar topics
09.04.2015Sacrifice the basement for 20m² more living space?15
22.09.2017Floor plan design for a single-family house with a basement on a sloped plot23
18.05.2018Single-family house with >180 sqm / basement / garage68
19.11.2018Design / Improvement Single-family house 150-175m² with hip roof and basement39
14.10.2019Floor plan design city villa with basement improvement suggestion?77
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
22.07.2020Floor plan city villa without basement 185 sqm - tips35
09.09.2020Criticism of single-family house floor plan desired (~175m2/0.9m knee wall/basement)16
25.04.2021Initial floor plan on graph paper: slope, basement + 2 floors.80
21.01.2021Hanging house 235 sqm with garage in basement on 3600 sqm plot15
07.02.2021Classic single-family house 200 sqm (plus basement) tips?32
10.06.2021New construction 200 sqm + basement with mansard roof18
17.08.2021Floor plan optimization single-family house, 2 full floors, no basement11
14.05.2023Floor plan single-family saddle roof house with basement, approx. 200 sqm76
13.11.2024Floor plan of a single-family house with basement and garage50
25.11.2023Sauna in the main bathroom or in the basement?34
09.09.2024Floor plan design: Single-family house with basement; 560 sqm plot65
14.10.2024Floor plan single-family house 136m² with garage & basement17
22.12.2024Floor plan of a single-family house with basement, 150 sqm, only single-story allowed115

Oben