General procedure / schedule

  • Erstellt am 2020-06-02 11:15:47

Eigenheim_2011

2020-06-02 14:05:47
  • #1
Thanks and for the input! yes, but if you go by that logic, you should never build with 2 providers or do any work yourself. Especially since, as mentioned, the prefabricated house company is usually also commissioned externally. We also want to have someone from the builders' protection association or another source on our side who helps us assess the individual trades. That surely costs a bit more, but you’re definitely better off than having no idea at all. I don’t want to presume to have the same eye in a few months as people who have been doing this for years or decades.
 

Eigenheim_2011

2020-06-02 14:09:18
  • #2
thanks and that's exactly why I started the thread
So does that mean I can't have the planning for an externally ordered basement handled by the house construction company?
Or to put it another way, if I commission a basement externally, is it only possible if I contract everything individually and carry out the project with an architect?
 

T_im_Norden

2020-06-02 14:10:14
  • #3
If you want to do the awarding, you either need an architect to do it for you, or you have to be knowledgeable yourself and have the time for it.

The gentleman from the building savings contract does not plan for you and also does not check your offers, he only looks to see if it was carried out correctly.

Own work is usually painting or flooring, all things that come when the house is almost finished.
 

Eigenheim_2011

2020-06-02 14:17:15
  • #4
this is what it says on the page about the building savings contract: Have your contract draft reviewed by our specialist lawyers before signing. During construction, our building consultants are at your side as experts. And even after completion, we help you to enforce your warranty claims in a timely manner.

So I feel like I'm getting more and more confused.

Maybe I'll ask differently:

If you want to realize the project with a prefab house provider and accordingly want to use their architect but want to commission the basement etc. externally. Does the architect still create everything (even if it then costs extra) so that you can order the other trades externally?
 

Lumpi_LE

2020-06-02 14:17:49
  • #5

That would certainly be very unusual and won’t give you any advantage.

No, you can also have an architect do the planning and then split it into 3 packages: basement, house, photovoltaic.
For that, you then look for 3 companies.
 

T_im_Norden

2020-06-02 14:21:20
  • #6
Checking the contract means that the lawyer looks to see if there are any obvious legal defects. An expert accompanies the construction means that he checks on the construction site whether the work has been done professionally. In any case, take a look at the prices that the [Bausparvertrag] calls for the experts and the legal advice.
 

Similar topics
21.08.2014Construction costs when building with architects. What does your experience say?18
26.01.2019Semi-detached house on a hillside with a basement, looking for a floor plan.17
11.02.2019Floor plan of a single-family house on a hillside with a basement19
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
23.01.2021Wooden ceiling and partial insulation for basement with garage15
07.02.2021Classic single-family house 200 sqm (plus basement) tips?32
02.03.2021Single-family house Bauhaus style/flat roof, 2 full floors + basement23
06.01.2022Architects or prefab house cost calculation and next steps27
10.10.2023Special floor plan or boring with basement?20
01.11.2023New construction settlement cracks in a masonry basement. What is still "normal"?12
09.09.2024Floor plan design: Single-family house with basement; 560 sqm plot65
17.06.2024Floor plan design for a single-family house with 165 sqm including a basement and light well20
20.07.2024First floor plan L-shaped house (190m²) with granny flat (80m²), basement15
20.01.2025Floor plan single-family house approx. 160m², main entrance in the basement, north slope 1700m²22
07.12.2024Floor plan check for new single-family house with basement43
01.01.2025Floor plan, house layout EFW 150m2, basement + granny flat - feedback desired67
23.01.2025Energetic House Renovation: Is it sensible to involve an architect?13
20.02.2025Approval for basement office - Freelancer (digital work only)30
20.03.2025Planning by general contractor or independent architect?22
29.03.2025Draft single-family house (EFH), 2 full stories, gabled roof, no basement, double garage31

Oben