Regarding your numbers.
- I find surveyors expensive; we paid 1,900 EURO.
- The second notary fees for the land charge order including registration also seem too high to me.
- Electricity/telecom and water connection cost us almost 5,000 EURO. We chose a multi-utility connection here. And the earthworks are not included in that.
- Earth removal is estimated far too low. Do you already have an offer for this? We were at almost 12,000 EURO for 450 cubic meters. Unless you really only have to pay for transport and maybe a farmer or someone else takes the earth off your hands...
- We paid just under 2,800 EURO for 2 revision shafts.
- Soil survey with 6 drillings up to 7 meters deep was 2,400 EURO including chemical analysis.
- Energy consulting costs are similar for us. If you actually build to [KfW 55], you get 50% back from [KfW] as a subsidy.
That’s a quick rundown.
- I find surveyors expensive; we paid 1,900 EURO.
- The second notary fees for the land charge order including registration also seem too high to me.
- Electricity/telecom and water connection cost us almost 5,000 EURO. We chose a multi-utility connection here. And the earthworks are not included in that.
- Earth removal is estimated far too low. Do you already have an offer for this? We were at almost 12,000 EURO for 450 cubic meters. Unless you really only have to pay for transport and maybe a farmer or someone else takes the earth off your hands...
- We paid just under 2,800 EURO for 2 revision shafts.
- Soil survey with 6 drillings up to 7 meters deep was 2,400 EURO including chemical analysis.
- Energy consulting costs are similar for us. If you actually build to [KfW 55], you get 50% back from [KfW] as a subsidy.