We have now been almost everywhere anyway, and I am happy to also send you a quote from the construction description regarding the planning services.
The documents required for a building notification or building application are prepared at a scale of 1:100 and in 3 copies. This service includes both the approval planning (including living space and building form calculation) as well as structural calculations, the thermal insulation certificate, proof that the currently valid Energy Saving Ordinance has been complied with, and the energy performance certificate. With the start of the house construction, detailed plans at scales of 1:50 and 1:20 are created, which become the property of the builder.
[U]Note[/U]
Possibly additionally required documents, such as biotope compensation planning, felling applications for valuable trees, storage requests for oil heating systems, demolition applications and the like, must be agreed upon and paid for separately. Fees and expenses for building permits, structural engineer review, chimney sweep, and other official fees, official site plans, and the later surveying are not included in the scope of services. The same applies to sewer connections as well as exterior facilities and paving work according to the drawing. Also not included in the scope of services are representations of interior furnishings not mentioned in the construction description (e.g., drawn-in furniture, kitchens, fireplaces, and tiled stoves).