Now things are moving fast :eek: The handover date has been moved forward to tomorrow, Sunday, on Tuesday we have an appointment with an architect who has shown interest and will draw us a first draft soon, and then the second architect on Saturday... We are already super excited, tomorrow for the first time alone in the house, calmly breathing in the atmosphere and thinking it over
 

ypg

2023-09-16 22:47:16
  • #2

Great! That is an awesome time in life. I've had the chance to experience it twice: sitting in an older house, sometimes seeing and breathing in the mustiness of the old, but also feeling and experiencing the new ideas. You go crazy from so many ideas :D
By the way, that's the wake-up call of the construction beer ;)
 

hanghaus2023

2023-09-17 18:44:56
  • #3
I am very happy about that. I am quite curious about the drafts from the architect.
 

hausbau_phobos

2023-11-17 08:58:17
  • #4
So, we are already in service phase 2 with an architect, with whom we seem to be on the same wavelength. I have to sign off the plans and upload them, I don't want to upload the original because of copyright.

Anyway, the garage remains a garage, but the children get the attic converted into a sleeping gallery :) I'm honestly jealous, I would have loved a children's room like that.

However, we had to say goodbye to our 600k :-/ we'll end up around 1m, but everything will be as we imagine, except the garden, but with a pool and terrace.
 

11ant

2023-11-17 10:57:08
  • #5

Nonsense, copyright does not depend on the form of the copy.

That sounds like a good plan.

60% budget overrun already at the stage Leistungsphase 2, don’t let hear that!
 

hausbau_phobos

2023-11-17 11:08:18
  • #6
Well, we probably could have managed with the 600k, but we decided to do almost everything. Otherwise, we would regret it in a few years. Besides, the prices are really even worse than expected :-/ Let's see, we have included quite a bit that we can save on if it really gets out of hand. The most expensive thing was the land anyway :rolleyes:
 

Similar topics
06.07.2011Garage directly attached to single-family house. Is the foundation sufficient?20
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
08.04.2015Install a technical room in the garage? Is this possible?35
19.08.2013Garage heating. What is the best / cheapest solution?10
08.01.2014Where do we put the house and garage?10
03.02.2014Cost estimate single-family house with garage11
05.08.2014First offer, 157m2 with basement, KFW 70, garage14
05.09.2014Floor plan design of a 170m² passive house with garage18
05.11.2014Garage: design possibility of the roof, appearance14
18.01.2015Walkable garage (terrace)11
11.03.2015Planning optimal arrangement of house, garage, and driveway13
21.04.2015Is a floor plan with a garage feasible on the property?29
06.05.2015Draft single-family house with garage/carport - please provide evaluation22
03.03.2017Garage too deep due to local design regulations13
12.07.2019Planning errors in garage drainage - are we really liable?12
26.04.2020Are phases 1-4 sufficient? Or additionally 5?11
22.05.2022Are performance phases 1-3 with the architect and lump sum offer somehow disadvantageous?19
18.01.2023Architect performance phase 1-4 - Which documents are required?33
07.03.2024Floor plan of a single-family house 240 m² with a partially built-over garage96
02.08.2025House arrangement including or excluding garage on a sloped property23

Oben