Now things are moving fast :eek: The handover date has been moved forward to tomorrow, Sunday, on Tuesday we have an appointment with an architect who has shown interest and will draw us a first draft soon, and then the second architect on Saturday... We are already super excited, tomorrow for the first time alone in the house, calmly breathing in the atmosphere and thinking it over
 

ypg

2023-09-16 22:47:16
  • #2

Great! That is an awesome time in life. I've had the chance to experience it twice: sitting in an older house, sometimes seeing and breathing in the mustiness of the old, but also feeling and experiencing the new ideas. You go crazy from so many ideas :D
By the way, that's the wake-up call of the construction beer ;)
 

hanghaus2023

2023-09-17 18:44:56
  • #3
I am very happy about that. I am quite curious about the drafts from the architect.
 

hausbau_phobos

2023-11-17 08:58:17
  • #4
So, we are already in service phase 2 with an architect, with whom we seem to be on the same wavelength. I have to sign off the plans and upload them, I don't want to upload the original because of copyright.

Anyway, the garage remains a garage, but the children get the attic converted into a sleeping gallery :) I'm honestly jealous, I would have loved a children's room like that.

However, we had to say goodbye to our 600k :-/ we'll end up around 1m, but everything will be as we imagine, except the garden, but with a pool and terrace.
 

11ant

2023-11-17 10:57:08
  • #5

Nonsense, copyright does not depend on the form of the copy.

That sounds like a good plan.

60% budget overrun already at the stage Leistungsphase 2, don’t let hear that!
 

hausbau_phobos

2023-11-17 11:08:18
  • #6
Well, we probably could have managed with the 600k, but we decided to do almost everything. Otherwise, we would regret it in a few years. Besides, the prices are really even worse than expected :-/ Let's see, we have included quite a bit that we can save on if it really gets out of hand. The most expensive thing was the land anyway :rolleyes:
 

Similar topics
08.04.2015Install a technical room in the garage? Is this possible?35
21.04.2015Is a floor plan with a garage feasible on the property?29
15.06.2015Garage - Building Application - Confusion36
13.01.2025Door House/Garage: Side entrance door as a fire protection door?27
20.10.2015Balcony on garage on boundary11
13.01.2016Is a 4m driveway sufficient for the garage?13
14.03.2016Build the garage immediately or later - experiences?17
22.03.2016Unintentional boundary encroachment garage16
15.08.2016Property - Building window - Location of house and garage44
06.04.2016Boundary construction garage at another corner of the property18
19.12.2016Garage approved, but carport built23
03.03.2017Garage too deep due to local design regulations13
22.08.2017Editing the plinth at the garage and sidewalk boundary11
02.09.2017Build over gas, water, electricity, and telephone lines with a garage?13
04.09.2017Sealing the garage with a concrete floor?21
12.07.2019Planning errors in garage drainage - are we really liable?12
26.04.2020Are phases 1-4 sufficient? Or additionally 5?11
22.05.2022Are performance phases 1-3 with the architect and lump sum offer somehow disadvantageous?19
18.01.2023Architect performance phase 1-4 - Which documents are required?33
07.03.2024Floor plan of a single-family house 240 m² with a partially built-over garage96

Oben