All previous answers do not relate to the [KfW300] program, which requires [KfW40] and Sustainable Building / [QNG]. This additional proof is very time-consuming and causes a lot of annoying work as well as further qualification of the consultant. I don't know if the amount is justified, but [QNG] is generally very expensive.
 

Ramona13

2023-10-13 11:03:00
  • #2
I think my statement can also be applied to the 300 program, since the same requirements apply to the 297. In the 300 you also have the choice whether with or without QNG ;)
 

paddi

2023-10-16 16:45:12
  • #3


Is it also the case that the materials used in the KFW300 without QNG are checked for sustainability? I mean in the LCA which is still required anyway. If I can purchase wood at price X and the energy consultant calculates that it has too high a CO2 impact, do I have to acquire wood at price Y much more expensive?
 

Ramona13

2023-10-16 18:16:22
  • #4

You can look up in ÖKOBAUDAT how each building material is treated. For KVH, for example, there is a value for DE and a generic one, so presumably wood not from Germany. The entire verification for all things, as far as I know, only becomes part of QNG; with the LCA, it’s more about roughly estimating the ecological balance. Our energy consultant definitely did not mention that he needs exact supply chains and proofs, otherwise we couldn’t do it with so much self-performance ;)
 

paddi

2023-10-17 08:19:39
  • #5

That's exactly what I thought. If I had to provide all the proofs and supply chains myself, I would seriously consider abandoning the whole KFW topic.
 

HungrigerHugo

2023-10-17 08:52:28
  • #6
One really has to ask oneself sometimes how someone can come up with such nonsense as QNG. One can hardly harass the citizens any more.
 

Similar topics
30.04.2013Wood or stone around the pool?15
13.06.2013Is wood enough for a garden house?11
06.11.2012Costs for energy consultant proof KFW7018
13.02.2014Mold on wood/ shell construction, is it possible to deduct the advance payment invoice?28
27.04.2015Shutters made of wood or aluminum? Electric or manual?15
19.06.2018Price differences between wood-aluminum vs plastic windows?17
10.07.2016Is an energy consultant necessary for KfW55?21
12.10.2018Wooden terrace - Which type of wood to choose, or WPC decking?31
12.02.2018Home door manufacturers wood / aluminum doors wanted22
04.02.2018Ready large garage wooden or concrete? What costs?12
13.02.2022Types of windows: Plastic, wood, or aluminum? Recommendations/experiences?43
08.05.2020New construction - Is an energy consultant worthwhile?12
02.10.2025KfW Funding Climate-Friendly Residential Building from March 2023167
07.03.2024New funding for family home ownership201
20.06.2025Energy consultant offer too high?23
10.10.2023Land in sight, is house construction financially possible?117
21.10.2023Land and home financing - together or separately?54
06.12.2023Electricity costs for a KfW QNG 40 house19
30.03.2024KFW 300 - Qng - Prefabricated house - Rhineland-Palatinate15
06.07.2025Is KFW300 possible without QNG seal?17