Hitokiri-1978
2021-03-11 15:36:09
- #1
After 2 years, the invoice for the road construction came in. 15k. I had overlooked it, I was only happy about the acceptable price.
?? How can you overlook a 15K invoice? :/
The price per square meter already sounds like a very expensive area. So the development costs are high too.
I don’t understand the logic?! Whether a company digs a hole in the ground and lays pipes and cables, it should cost the same in northern Munich as in Landshut, Nuremberg, Bayreuth or anywhere else (just to stay in Bavaria)? I’m not paying for the land (location, location, location) but for a service!
My boss, who is currently building and whose house is only about 40 km from us, reportedly paid about €5,000 in development costs. His property is also on a slope, which I can imagine might be more expensive in itself than digging on a flat meadow.
In the presentation from the municipality at the information event, it was said “Development costs are to be paid separately.”
By the way (I would have liked to insert the link to the internal thread), the parcels (status 03/11/21) are allocated exclusively on a leasehold basis. So yes... first the allocation process has to take place. Then you have to get the contract, then we have to really think deeply about whether we really want to do this (link not here :) ), and then you should take a closer look at the topic of “development costs.” But I can already see, it was good to take out legal expenses insurance :)