Development costs for a plot in the second row

  • Erstellt am 2020-11-21 10:36:39

Tarnari

2020-12-05 22:06:38
  • #1
Although they are not development costs in the strict sense, fastening plus surfacing, possibly lighting, are added. For such a length, not a small amount.
 

guckuck2

2020-12-06 06:22:52
  • #2
Construction cost subsidies for water and wastewater included?
 

tristan01

2020-12-06 12:08:37
  • #3


What do you mean by that?
Where does one apply for something like that?
 

guckuck2

2020-12-06 12:42:10
  • #4


Construction cost subsidies for wastewater and water are charges for the upstream infrastructure. So not the connections on your own property but for distributors etc. in front of that. As a rule, the construction cost subsidies exceed the connection fees again.
 

JoachimG.

2021-01-01 16:17:29
  • #5
So I have now received the offer. 45 meters of access path - 4m wide (without final surface layer, which will come after construction), sewage and rainwater drainage channel as well as empty conduits (water, telecom, electricity) for 2 plots, inspection shafts, 2 surface drainages for the street and some other small stuff. 28 thousand euros.
 

Andreas94

2021-01-15 08:03:55
  • #6

Hello Tristan,

we are currently in a similar situation. Therefore, just a quick follow-up.

The development costs are usually divided as follows:
1. structural measures to bring all utilities to the property boundary
2. contribution rates for fresh water + wastewater combined sewer for the development (regulated according to property size and living space size)

The municipality / supplier is responsible for the complete development according to Art. 123 para. 1 Building Code.

Now the question is who bears the costs for the structural measures and whether the contribution rates are additionally charged?
How is it with you? Do you have to bear additional costs as mentioned in point 2 in addition to the structural measures?

Regards
 

Similar topics
19.02.2015Development costs §127 Building Code12
02.07.2015Development costs for gas and sewer pipelines11
16.12.2015Sewage costs - I am somewhat stunned15
11.03.2018Backend development connection costs?30
22.05.2017Development costs are rising and rising13
30.01.2017Development costs and information before property viewing10
13.05.2018Development costs for subsequent construction10
08.06.2018Development costs - How are they calculated?10
31.07.2018House connection costs for wastewater. Included in the ancillary construction costs with 3.5K.13
21.09.2018Municipality development costs are too high - Should we commission it ourselves?16
19.10.2019Development costs / House connection costs11
29.03.2021150 Euro / sqm development costs = realistic or usury?58
03.04.2021Development costs are becoming increasingly expensive; can one resist?22
05.06.2021New building connection costs, especially wastewater17
01.07.2022Building maintenance land in Hochwald/Hunsrück - Current development costs?10
12.02.2025Suitable slope for wastewater14

Oben