Yay. We are in the final phase of planning. The construction contract is supposed to be signed next week. I will get back to you with the final floor plans, sections, and perspectives and hopefully soon in the house pictures thread.
The building application has been submitted. If we don’t hear anything within two weeks, we are allowed to start, woohoo. However, tomorrow I will probably quietly cry while checking with the building authority.
The financing is secured, the garden landscaper is ready to go for the wall panels and the (earth) groundwork. The kitchen is close to finalization. Things are moving!
Here is the final version. I especially love the glass wall between the hallway and the kitchen in House 1. That will make the whole thing bright and open. We would like such loft glass walls with black steel bars and a matching sliding door. We’ll see if I twitch at the locksmith’s quote or just giggle hysterically...
We are getting flat Braas Tegalit roof tiles, colored plaster (the houses in different lighter/darker shades), box gutters and colored windows. Because there is no roof overhang, we believe we will achieve a very modern, clean look. Hopefully next time you’ll read from me in the house pictures thread.
PS: We changed the terrace door in the kitchen of House 2 into a window. The island will then move over to the wall facing the hallway. We are putting a long table in the dining room. Great joy