apokolok
2021-09-26 23:10:11
- #1
I completely disagree here.
Remove all tiles.
With a decent chipping hammer, this can be done by two people in a few days.
I would also completely redo the bathroom. Sure, it is usable, but you won’t feel comfortable in it.
Also here --> do all demolition work yourself.
When ordering containers, pay attention to sorting purity, meaning do not mix construction debris with residual waste.
Then it counts as recyclable material and disposal costs are quite low.
25,000€ for 160m² of floors is, in my opinion, too much; if you prepare everything yourself, it can be done much cheaper.
I consider painting costs realistic if nothing major is changed on the surfaces otherwise.
Remove all tiles.
With a decent chipping hammer, this can be done by two people in a few days.
I would also completely redo the bathroom. Sure, it is usable, but you won’t feel comfortable in it.
Also here --> do all demolition work yourself.
When ordering containers, pay attention to sorting purity, meaning do not mix construction debris with residual waste.
Then it counts as recyclable material and disposal costs are quite low.
25,000€ for 160m² of floors is, in my opinion, too much; if you prepare everything yourself, it can be done much cheaper.
I consider painting costs realistic if nothing major is changed on the surfaces otherwise.