KFW 153 - Repayment grants and maximum loan amounts increase

  • Erstellt am 2020-01-09 08:41:36

Dr Hix

2020-01-12 23:31:32
  • #1


As far as I understand the KFW, there are basically 2 options:

1) Declare waiver, wait 6 months and reapply
2) Change funding level

So you would have to build according to KFW40, then the change should also bring you the current conditions.



As far as I have read, this takes place over 3 years:

1st year (completion of construction) = max. €14,000
2nd year = max. €14,000
3rd year = max. €12,000

However, the tax liability must first allow for these amounts

Moreover, at least for me personally, the question spontaneously arises how many owners of owner-occupied, completely unrenovated old buildings with such an income have not long ago already used the low-interest phase to renovate the place
 

Tassimat

2020-01-13 06:49:46
  • #2
Isn't the purchase of an unrenovated house enough?
 

fragg

2020-01-13 09:16:17
  • #3
it is. now even more. it already was before. + tax benefits. what’s important is the actual spatial separation. own bathroom, own entrance, own kitchen, no connection to the main house. (so have the door frame bricked up right away for later) no need for separate electricity meters etc.
 

Piotr1981

2020-01-13 12:22:25
  • #4
Great! Thanks for the hint
 

Dr Hix

2020-01-13 12:45:27
  • #5
I'm not a tax expert, but the law talks about "owner-occupied residential property" and I understand this – analogous to the previous regulation on craftsmen's costs – to mean that one lives in the building, or that the costs "are closely related in time to the move-in." No idea how this last passage is interpreted.
 

teh_M

2020-01-13 18:15:02
  • #6



I spoke with the KfW today and can confirm these possibilities. Same funding level = wait 6 months. If the funding level improves, a new application is possible.

My financing partner is checking the response from the central office regarding the prepayment penalty and the process for a new application by tomorrow, and as long as that’s okay, I can switch. Even without adjusting the land charge. Let’s see if it works out in the end.

OT: I was already annoyed in October for not building the 40+ house. The photovoltaic system has been running at my place for a week now (subsystem), and for the battery with about 5 kWh, a €5,000 subsidy would still have been "worthwhile." At that time, I had opted out of it because the start-up already created additional costs.

Now I might be lucky and can switch from the Kfw40 funding level to 40+, I "only" have to build the battery with visualization.
Old is now: €100,000 with €10,000 funding
New would be: €120,000 with €30,000 funding

My goodness, what a lucky coincidence if this works out...
 

Similar topics
13.07.2016Photovoltaic storage - experiences? Tips?17
10.10.2017New photovoltaic system with storage in single-family house - experiences39
17.05.2017Photovoltaics initially without storage54
30.09.2018BAFA funding for air-water heat pumps in new construction - how does it work?30
05.03.2018Photovoltaic planning - possible retrofitting of battery storage13
31.07.2018Storage heats collector10
01.05.2021Photovoltaic system battery storage subsidy feed-in tariff?44
07.05.2020Collaboration of air-water heat pump, photovoltaic system and storage38
24.01.2020Annual performance factor calculation for funding (parameters and calculation tool)29
05.05.2020Photovoltaic system + storage with or without cloud tariff13
08.05.2020Heat pump + photovoltaic system with or without storage11
27.09.2020Oil heating system approximately 25 years old, storage defective15
13.08.2020Is energy storage also unprofitable for electric cars? Costs of wallbox + storage79
04.11.2020Solar system with storage in the garage, possible?28
09.11.2020Lower Saxony subsidizes photovoltaic storage20
07.11.2021Newly built single-family house - gas or air heat pump + photovoltaics + storage?169
16.07.2021Cost of photovoltaics with storage120
14.06.2022KfW BEG funding stopped 261, 262, 263, 264, 461, 463, 4641239
28.03.2022Photovoltaics are coming up - Options: 19 kWp, 25 kWp, 30 kWp, Storage?30
06.08.2022Saving photovoltaic system, storage, power cloud41

Oben