Is building a house possible with our income?

  • Erstellt am 2019-05-13 07:42:36

Joedreck

2019-10-09 12:14:53
  • #1
I pay 4.46 cents/kWh.. Plus basic fee. If you already have to watch every cent now, please forget about the house
 

Tassimat

2019-10-09 12:17:31
  • #2
How much financial buffer is there?
 

Nissandriver

2019-10-09 12:29:58
  • #3


Why watch every cent? Wanted to calculate it approximately. For us, it costs 5.91 cents/kWh. That makes an annual consumption of 18,000 kWh.. The municipal utilities and all other portals also calculate with 18,000 kWh for 4 people..

10k in credit and 10k backup..
 

Joedreck

2019-10-09 12:51:07
  • #4
You can't extrapolate anything. Maybe the owner only heated two rooms, or whatever.. We are four people using 22000 kwh/a. Roof very good, windows and facade moderately insulated. 20k is nothing, by the way. PAY ATTENTION TO THE ROOF! Hire an expert!
 

Nissandriver

2019-10-09 13:03:18
  • #5


As I said, on Monday it will be mentioned that I want to send an expert. If they refuse, it's over anyway.

Regards

Steven
 

Tassimat

2019-10-09 13:35:30
  • #6


No, without an expert you offer €20,000 less to be able to cover eventualities.

You have to make it clear to them that the expert should only confirm the current condition and is not coming to renegotiate the price or badmouth the house. Sellers are always afraid of that. Maybe you can find a nicer term than "expert". How about "friendly structural engineer" or something like that.
 

Similar topics
04.11.2012Expert despite TÜV approval?13
01.10.2013Construction company would rather not have an assessor11
25.05.2015Extractor hood / roof or wall14
03.03.2015Insulating the roof with kitchen paper/toilet paper12
24.05.2015KfW 55 with wooden house - U-values: Wall 0.18 - Roof 0.1617
14.12.2015Expert discovers defects in the basement. What to do?11
05.05.2016Insulate the roof: flakes, panels or wool17
07.03.2020Children's room on the upper floor open up to the roof25
30.06.2016Existing property - appraiser, financing, negotiating...17
20.09.2016Extending walls beyond the roof?!43
10.03.2017Roof design / Use of 2nd floor mandatory with 2 full floors23
20.10.2017Roof with photovoltaic or other investment, any experiences?19
12.09.2017Roof constructed too flat - Construction company does not acknowledge the defect12
21.10.2017Sealing the base slab before the roof is installed19
20.04.2018Roof covered with fake tiles - house accepted.12
01.08.2018Construction company demands extra costs due to cooperation with appraiser21
01.11.2020Rough cost estimate house renovation built in '73 - appraiser17
20.10.2021Renovation of a 1960s house: Questionable expert recommendations?92
17.03.2022DSL Bank takes a long time processing, now also sending surveyors for 200k22
07.05.2023Is it sensible for the expert to inspect the base plate?55

Oben