House Pictures Exchange - Show your house pictures!

  • Erstellt am 2015-11-25 10:27:31

Pinkiponk

2020-10-25 07:54:24
  • #1

In my assessment, the self-enhancement of many people through the devaluation of others works, which "certain" media greatly facilitate.
 

OWLer

2020-10-25 08:00:47
  • #2
How about a picture for a change?

Here you can clearly see how at least two parties slept during the planning phase.

The draft drawer/"drawing servant" and the client. Basement window and kitchen window are 5cm off alignment. It annoys me a bit...

We can't move or enlarge it above due to symmetry. Below, I'm damned if I'll have those with the big saw make the hole bigger. So this is my first agenda item (besides the right window, which will be closed) of "we would do differently next time."

 

matte

2020-10-25 08:21:50
  • #3
There will definitely be a light well at the basement window. If it is designed asynchronously so that it matches the kitchen window, I could imagine that it wouldn't be so noticeable anymore...
 

guckuck2

2020-10-25 09:59:16
  • #4
Yeah, you can cover that up with the light shaft.

Other than that, I don't see any problem with firing up the saw for a fifty.
 

kati1337

2020-10-25 11:55:28
  • #5
That's how we did it too. In the new house, we already have significantly more sockets than in the old rental house. We definitely added about 30 or so extra. Above all, this covers the fact that you really have one everywhere you need one, so you never have to run cables across half the house. Even where we knew devices would go, we were happy to install a few more. We still can't avoid multi-socket adapters. Mainly because some devices have cables that simply aren't long enough. If they stand on or in something, you have to extend somehow. And whether you see the cable of the multi-socket adapter or the cables of the devices - it doesn't make much difference. But what I would always get with an extra charge: the in-wall duct for the TV on the wall. It looks SO MUCH better when no cable is dangling down.
 

fskscorp

2020-10-25 17:03:08
  • #6
So the network cabinet is also hung. Now all the cables are laid and this week I want to finish the distribution cabinet. I will order another dimmer actuator right away. I had only planned for 8 channels but they are already full and I can still use at least 4 more.


 

Similar topics
18.10.2013SAT and/or cable?12
16.07.2015Cable for outdoor lamp too short11
01.01.2016Cost of house connection for Kabel Deutschland and Telekom?37
26.12.2018Omit basement windows in ventilated basements?20
14.01.2018Kabel Deutschland or Telekom or both14
09.06.2017Computer cables and Wi-Fi router43
12.12.2017Many colorful cables for lamp connection - How to connect the lamp?11
19.02.2018UPT cable - What is it and where to install?10
04.02.2020Installation of additional insulation for underfloor heating - cables lie on the raw floor slab25
07.09.2021Wi-Fi New Construction - Network Sockets/Cables53
06.06.2020Pull the cable through the conduit20
08.04.2021Building without antenna and SAT-CAT cable without conduit?65
01.09.2020Which conduit for LAN cable?32
18.09.2020CAT cable in the utility room - not crimped?45
19.02.2021Telekom Hybrid or Vodafone Cable - Advantages & Disadvantages for Internet36
04.01.2022Cable vs. Telecom Fiber Optic - Decision56
08.05.2021Connecting LED ceiling lamp - several cables hanging from the ceiling27
16.09.2021Apply for cable and/or DSL connection37
28.08.2021Looking for a suitable doorbell for CAT 7 cable12
11.09.2021Which Cat cables should be installed on the facade? Problems with moisture?29

Oben