Could be
 

Pinkiponk

2019-11-13 09:33:18
  • #2
Whether I am truly thrifty, I do not know. For the sample selection, I have budgeted 70,000 euros and hope to manage with that. I can live well with surface-mounted thermostats, but I do not want to give up exclusively floor-to-ceiling windows/doors (ok, one exception for the sake of my husband ) with shutters.
 

Mottenhausen

2019-11-13 12:20:56
  • #3


Which trades and scopes should be roughly included in that? Really just pure interior fittings: bathrooms and stuff, or also basics like entrance door, electric shutters/venetian blinds, roof tiles, etc.?

70K€ sounds like a lot at first, but the surcharge lists are unfortunately looooong.
 

ypg

2019-11-13 14:59:35
  • #4

Yes, you become greedy

It depends on what the base price refers to. Is it a shell house? Should the 70,000 also cover extra technology (KfW) and builder-supplied flooring? Or is it "only" for visible interior fittings?
Everything is relative.
Our catalog house was at 150,000. With an open space and (a bit) more technology as well as anthracite-colored windows, we quickly reached 185,000. With the flooring, electrical installations, paint on the walls, drywall extras, and additional costs for sanitary facilities as well as electrical gadgets, we are probably also at these 70,000 (I don’t remember exactly). If we had now also changed these awful white sockets with those surface-mounted thermostats, we would probably already be at 75,000.
 

Pinkiponk

2019-11-13 15:07:00
  • #5

No, the house is turnkey, insofar as it has white textured wallpaper inside and also the flooring is included... both of which we will probably upgrade.
In which year were there still catalog houses for 150,000? Now in 2019 I haven't seen any.
 

ypg

2019-11-13 15:36:15
  • #6
then is it Danwood? Which house is it? with Danwood keep in mind (I don’t know: it sounds like you don’t have an offer yet) that for example transport costs can amount to several thousand euros. Also, a change in the floor plan comes with an architect’s flat fee (back when we inquired in 2013 it was 3 or 5000). You are only looking at prefabricated construction anyway.
 

Similar topics
17.09.2017Prefab House Forum - Complete house possible for 150,000?29
15.10.2013electric roller shutters / switch17
29.08.2013Calculate equity and financing12
15.10.2013Bungalow floor plan, looking for valuable tips / comments24
09.02.2014Bungalow Floor Plan Draft Opinions22
15.07.2014Foundation slab for Danwood bungalow? Company for complete works?11
09.09.2016Controlled residential ventilation and still open windows at night71
10.03.2017Condominium or "Single House"28
25.04.2018Kniestock Danwood House in Schleswig-Holstein - What is the maximum possible?23
28.12.2018On which of these floor plans can we continue to build?287
23.02.2019Complete house purchase for the small budget122
08.01.2020Floor plan design for detached single-family house 9x16 m - requesting suggestions27
07.06.2020Single-family house optimization and planning (180 sqm + attic without basement)159
26.04.2021Is a house for a total volume of 400k still possible at all?334
01.11.2024Danwood complete offer vs. separate commissioning architect13
08.04.2025Floor Plan Critique: Bell Tower House - What can be improved?29
22.05.2025Danwood Family - Project realistic?18

Oben