Front view windows are suboptimal and need to be optimized

  • Erstellt am 2022-11-02 09:04:25

verwirrt

2022-11-02 15:03:04
  • #1
according to the internet, this should also be permit-free in NRW. My husband once sent an email to the city.


the birth was 7 months ago. And the older children, of course, keep me busy as well. I wish I could block out the house and enjoy the time with the children
 

Malunga

2022-11-02 15:25:38
  • #2
So I would say that the [BauHERR] is allowed to tell the [BauLEITER] what happens with the shell construction. If the shell opening is to be enlarged, then now, before it is plastered and insulated. Bring in a structural engineer and done. Are the windows already ordered? Very long delivery times currently. The [BauLEITER] represents the interests of the builders and not the other way around! Don’t let yourselves be intimidated or discouraged.
 

verwirrt

2022-11-02 15:44:50
  • #3
we are in talks with the city and the structural engineer. As soon as we have more information, we will also put more pressure on. I doubt it will help, but since they haven’t found a roofer, we are already 2 months behind schedule. We could have ordered the windows a month ago.
 

WilderSueden

2022-11-02 16:11:30
  • #4
It seems to me that you have bigger problems than just a 2-month delay. For me, the windows were ordered at the end of April and arrived at the end of July. If you haven't ordered them yet, it won't happen this year and probably not in January either. At this point, I would also urgently ask the construction manager why the roof had to be covered before the windows could be ordered.
 

verwirrt

2022-11-02 16:22:29
  • #5
sry I expressed that incorrectly. The windows are already there, only the windows I wanted to change were not ordered. We are supposed to do that only after the final inspection…
 

Costruttrice

2022-11-02 16:48:58
  • #6

I think it depends. We inquired with the manufacturer ourselves two weeks ago and they said it currently takes them 7-8 weeks. Because of Christmas, it’s going to be tight for us now, we haven't ordered yet.
 

Similar topics
18.05.2011Minimum scope of services Architect + structural engineer possibly self-performance?10
03.06.2014Interior design - windows14
18.06.2014Inspector defect identification, determination of window installation10
18.05.2016Help needed with window arrangement!32
09.04.2015For porthole, special regulations? Window, single-family house 1.5 stories.18
22.04.2015Window, roller shutter, exterior plaster10
28.05.2015Round window - dissatisfied with the interior reveal16
27.05.2015Which roller shutters with a closed window, only glazing?13
15.10.2015Kitchen planning with deep windows43
12.11.2017Minimum width for a 2-wing window/terrace door?48
10.12.2015Proper drying / tilting the window?24
21.02.2016Secure windows/front door for edge location34
29.05.2016Single-family house, single storey, knee wall, upper floor window30
28.11.2017Every word penetrates through the windows. Is it the same with you?21
02.12.2020Additional costs / surcharge Higher windows48
14.05.2020Is the window installation correct? Is it wind-driven rainproof?25
16.05.2021Handle position on the window not centered - defect?51
04.09.2021Structural engineer not for probation acceptance, and now?21
29.11.2021Window sill height 130 in the bedroom / study?93
24.05.2023Install a window afterwards?25

Oben