Well, you are (again) right ;)
A draftsman only draws, an architect provides his knowledge and his studies.
However, I was talking about an architect, who at least had to contribute his stamp.
... crazy, because I see a 2D planning in the initial stage, completely unbalanced. I consider the staircase implementation not worthwhile, so that one can later say: it was worth it – whether in terms of the house or renting it out. The design now has flaws (because the planner doesn't care about many things or didn’t even think about them). Later one has little comfort. And why should anyone rent 140 sqm with a 5 sqm shower bathroom later?
And yes, you have the feeling that everything has to be planned mainly against a boring social environment (even if they can discuss loudly) – I have to smile because we plan so many galleries here, also fully glazed, central stairs etc., and you duly note your “ideas” here, but in my opinion they are only amateurishly implemented.
And that is why I find it crazy that an architect agreed to this. But why should he care, he won't have to supervise the renovation or present himself with this planning.
It's a shame that no discussion took place.
 

Teilung

2020-12-08 18:59:42
  • #2
I think it’s good that you are thinking about [in 20 years]. We have done that too and I find it a great relief to at least have the option to rent out parts of the upper floor. Friends of ours also planned it that way. In general, the conversion should not be too complicated and the change of stairs sounds complicated and expensive. Is there not a simpler way here? Stairs outside or a shared entrance after all. Important and not to be underestimated is also soundproofing and, if necessary, electricity.
 

Similar topics
19.07.2018Draw the plan yourself? Do you necessarily need an architect?11
18.02.2011Architect totally messed up - experiences?17
30.09.2012Final invoice architect13
27.10.2013Architect --> Agreements? What is that?21
16.04.2014Cost of soil survey - Does the architect pay or do we?12
16.09.2014Termination of collaboration with architect - demands excessive fee28
01.10.2014Collaboration with an architect - how does it work properly?22
25.02.2015Planning / Architect, involvement of specialist planners for the approval plan10
10.04.2015Cost estimate architect single-family house. Your assessment44
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
27.12.2015Who has built with an architect? Experiences??85
11.09.2015Building a garage on the boundary is not possible according to the architect.11
17.11.2015Is an architect really that expensive?46
05.04.2020Developer or architect - costs43
07.03.2016Various dimensions architect execution drawing12
23.09.2016Architect and budget limit... insurance? possibilities25
17.04.2017Civil Engineer vs. Architect17
13.06.2017Architect or developer? Which is more affordable?13
24.05.2018Connecting two houses - How to design the renovation?12
04.10.2022Architect does not keep the schedule - what to do?21