To be continued, the drywall was completely redone, the architect of course wants me to pay for everything now, since I wanted to do the attic myself, he accuses me that if the attic were insulated, there would be no heat-cold exchange, to which I can only say, how on earth is there supposed to be a heat-cold exchange when everything was still unheated, and secondly the architect should have told me that I should have done the attic first. The drywall contractor of course also wants to cover no costs, because allegedly everything was dry where the drywall was done, I then told the drywall contractor that the construction at 5 degrees in winter and still unheated and with interior plaster already in place, could not possibly have been dry, I also mentioned the roof hatch and today suddenly came an email that I had not ventilated carefully, slowly I believe the excuses are running out, personally I am no longer interested in such childish nonsense, tomorrow I have an appointment with the lawyer.